Loading...
HomeMy WebLinkAbout~Master - Change Order No. 4 for Ames Steam Electric Plant's Inactive Coal Combustion Residuals Surface Impoundment RESOLUTION NO. 19-115 RESOLUTION APPROVING CHANGE ORDER NO. 4 ON CONTRACT WITH SCS ENGINEERS FOR AMES STEAM ELECTRIC PLANT'S INACTIVE COAL COMBUSTION RESIDUALS SURFACE IMPOUNDMENT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 4 on contract with SCS Engineers of Clive, Iowa, for the Ames Steam Electric Plant's Inactive Coal Combustion Residuals Surface Impoundment be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 261h day of March, 2019. e!!!fAJ_ j3LV1jAJ_ yVV1_11r Diane Voss, City Clerk JohnJohnM Haila, Mayor Introduced by: Gartin Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin Voting nay: None Absent: Nelson Resolution declared adopted and signed by the Mayor this 26" day of March, 2019. CITY OF CHANGE ORDER NO. 4 Pm es" I S CONTRACT 1 BID NO: ' 2018-055 PURCHASE ORDER NO: 54905 March 22, 2019 Project: Engineering Services for Compliance with Select Provisions of EPA's Coal Combustion Residuals (CCR) Standard J Contractor Name: SCS Engineers Change Orders Approved to Date: Address: 8450 Hickman Road Suite 20 1 $4,415.00 13 1 $10,820 City,State,&Zip Code: Clive, IA 50325 2 $122,780.00 14 The contract is modified as follows upon execution of this Change Order. The changes included in this change order are made in order to carry out the original intent of the contract. The changes included in this change order are to be accomplished in accordance with the terms. stipulations, and conditions of the original contract as though includea herein. DESCRIPTION NTE AMOUNT The purpose of this Change Order is to provide the City of Ames with feasible alternatives of how to transition the ash site in its current arrangement into a site that is useful for the future and in compliance with the U.S. EPA's Coal Combustion Residuals (CCR) Standard (rule). The ash impoundment's bottom elevation which contains CCR material (coal ash) is by the CCR Standard currently too close to the groundwater elevation requiring the site to either be closed, or be redesigned and reconstructed to come into compliance with the CCR Standard. With this Change Order, SCS Engineers will accomplish the following tasks: 1) Perform an initial screening analysis of the current eight (8) alternatives to eliminate the ones that are fatally flawed. 2) Of the alternatives remaining, perform a preliminary cost estimate on each alternative. Choose up to three (3) alternatives to move forward on. 3) Develop a preliminary conceptual design (including drawings), and update and refine the cost estimates of each alternative based upon the design. Determine If there are regulatory issues or questions that need to be discussed with the appropriate regulatory agencies. 4) If there are regulatory issues or questions that need to be discussed with the various regulatory agencies, set up and conduct the necessary meetings. 5) Summarize the information, data, findings, and develop conclusions in a Feasibility Study Report. This study is anticipated to be able to be completed by May 31, 2019. This Change Order's scope of work will be performed on a lump sum basis [except for the meetings in item 4) that will be charged on a T&M actual cost basis]. with a not to exceed total fee of$39,880. This Charge Order is based upon SCS Engineer's proposal dated March 19, 2019. TOTAL $39,880 Contract Price: Original contract rice: _ $30,710.00 Change orders approved to date: $138,015.00 Amount of this change order: $39,880.00 Adjusted contract price including this change order: $208,605.00 Accepted City of mes: Accepted by Contractor: cce d by f Am :. -�(a-L, Donald Kom, Director Si nature Jo n A. Hails, Mayor City of Ames Electric Services r �i� �. er t��o 1 rr City of Ames Printed name & tit e � /2� �� yy)(.v�cJh )a, W)VI, ` Date Date Date