Loading...
HomeMy WebLinkAbout~Master - Professional Service Agreement with WHKS & CO. for the 2018/19 Shared Use Path System Expansion RESOLUTION NO. 19-097 RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT WITH WHKS & CO. FOR THE 2018/19 SHARED USE PATH SYSTEM EXPANSION FOR THE CITY OF AMES WHEREAS,this project provides for construction of shared use paths on street rights-of-way, adjacent to streets,and through greenbelts in accordance with the Long Range Transportation Plan (LRTP); and, WHEREAS, the project will be south of Lincoln Way and create a connection between the Beedle Drive area and the Intermodal Facility; and, WHEREAS, a Request for Proposals(RFP)was created to solicit consulting design service that included one public informational meeting, one bicycle stakeholder meeting,and design of the shared use path; and, WHEREAS, services will include a base survey,evaluation of construction technique,area drainage analysis,preparation of plans and specifications,notification and coordination with right-of- way users, and attendance at a pre-construction meeting; and, WHEREAS, the 2018/19 Shared Use Path System Expansion would require submittals to meet Iowa DOT letting requirements with an anticipated 2019/20 winter letting for construction in 2020; and, WHEREAS, eight RFPs were received and evaluated using the following criteria: Project Understanding, Design Team, Key Personnel, Previous Experience, Project Approach, Responsiveness,Ability to Perform Work,Proposed Project Design/Letting Schedule,and Estimated Contract Cost; and, WHEREAS,the planning,land acquisition, and engineering for this project is shown in the 2017/18 Capital Improvements Plan (CIP) with funding in the amount of$180,000 from Local Option Sales Tax and the construction is shown in the 2018/19 CIP with funding in the amount of $241,000 from Local Option Sales Tax and $159,000 from MPO/STP funds for a total project budget of$580,000. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the Professional Services Agreement with WHKS & Co. for the 2018/19 Shared Use Path System Expansion-Trail Connection South of Lincoln Way(Beedle Drive to Intermodal Facility) is hereby approved in an amount not to exceed$57,138. ADOPTED THIS 26`'day of March, 2019. Diane R. Voss, City Clerk John . Haila, Mayor Introduced by: Gartin Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin Voting nay: None Absent: Nelson Resolution declared adopted and signed by the Mayor this 26t'day of March, 2019.