Loading...
HomeMy WebLinkAboutA013 - Letter dated September 9, 2002 certifying completion of utilities Public Worlcs Department e Caring People 515 Clark Avenue, Ames, Iowa 50010 Q"ali`yP'ogra- Phone 515-239-5160 A Fax 515-239-5404 EueplionaI Sei vice September 9, 2002 Honorable Mayor and Council Members City of Ames =' _ , 2 is :i Ames, Iowa 50010 Mr El Y5 Ladies and Gentlemen: �� r I hereby certify that the utilities required as a condition for approval'of the final plat of Northridge Heights Subdivision, 4`' Addition have been completed in an acceptable manner by Halbrook Excavation. The above mentioned improvements have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa and found to meet city specifications and standards. As a result of this certification it is recommended that the financial security for public improvements on file with the City for this subdivision be reduced to $64,000 for the remaining work that. includes $6,000 for the street lights and $58,000 for the pavement. Sidewalks also remain to be completed, but are covered under a separate agreement that does not require financial security. I further certify that the quantities of the completed work are as follows: See attached sheet. Sincerely, Paul D. Wiegand, P.E. Public Works Director PDW/dwj Attachment cc: City Clerk, Finance, Contractor, PW Administrative Assistant, Construction Supervisor, Planning &.Housing Director; and Chuck Winkleblack, Hunziker &Associates Northridge Heights Subdivision, 4`'Addition September 9, 2002 Page 2 � s � �N2 gr�C �y�,��� r z�5� �t�°� � a�� ����"s'a %- ���.��✓° x a� ��t� Storm sewer 12" storm sewer l.f. 90 15" storm sewer l.f. 24 18" storm sewer l.f. 16 42" storm sewer l.f. 416 Storm sewer manhole ea. 2 Storm sewer inlet structure ea. 2 6" collector line l.f. 355 Collector line clean out ea. 2 Sanitary sewer 8" sanitary sewer l.f. 1,010 Sanitary manhole ea. 4 Water Main 8" water main l.f. 861 Main line valve ea. 4 Hydrant and hydrant valve ea. 2