HomeMy WebLinkAboutA013 - Letter dated September 9, 2002 certifying completion of utilities Public Worlcs Department
e
Caring People 515 Clark Avenue, Ames, Iowa 50010
Q"ali`yP'ogra- Phone 515-239-5160 A Fax 515-239-5404
EueplionaI Sei vice
September 9, 2002
Honorable Mayor and Council Members
City of Ames =' _ , 2 is
:i
Ames, Iowa 50010
Mr El Y5
Ladies and Gentlemen: �� r
I hereby certify that the utilities required as a condition for approval'of the final plat
of Northridge Heights Subdivision, 4`' Addition have been completed in an
acceptable manner by Halbrook Excavation. The above mentioned improvements
have been inspected by the Engineering Division of the Public Works Department of
the City of Ames, Iowa and found to meet city specifications and standards.
As a result of this certification it is recommended that the financial security for public
improvements on file with the City for this subdivision be reduced to $64,000 for the
remaining work that. includes $6,000 for the street lights and $58,000 for the
pavement.
Sidewalks also remain to be completed, but are covered under a separate agreement
that does not require financial security.
I further certify that the quantities of the completed work are as follows:
See attached sheet.
Sincerely,
Paul D. Wiegand, P.E.
Public Works Director
PDW/dwj
Attachment
cc: City Clerk, Finance, Contractor, PW Administrative Assistant, Construction
Supervisor, Planning &.Housing Director; and Chuck Winkleblack, Hunziker
&Associates
Northridge Heights Subdivision, 4`'Addition
September 9, 2002
Page 2
� s � �N2 gr�C �y�,��� r z�5� �t�°� � a�� ����"s'a %- ���.��✓° x a� ��t�
Storm sewer
12" storm sewer l.f. 90
15" storm sewer l.f. 24
18" storm sewer l.f. 16
42" storm sewer l.f. 416
Storm sewer manhole ea. 2
Storm sewer inlet structure ea. 2
6" collector line l.f. 355
Collector line clean out ea. 2
Sanitary sewer
8" sanitary sewer l.f. 1,010
Sanitary manhole ea. 4
Water Main
8" water main l.f. 861
Main line valve ea. 4
Hydrant and hydrant valve ea. 2