HomeMy WebLinkAboutA018 - Letter dated June 14, 2002 certifying completion of utilities and paving Public Works Department
° 515 Clark Avenue, Ames, Iowa 50010
CarirrgPe°'g` Phone 515-239-5160 A Fax 515-239-5404
Qa°(i"Programs
Exeep ionaf Service
June 14, 2002
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the following utilities and paving required as a condition for
approval of the final plat of South Gateway Development, Phase One have been
completed in an acceptable manner by McAninch Corporation and Nuck.olls
Concrete. The above mentioned improvements have been inspected by the
Engineering Division of the Public Worlcs Department of the City of Ames, Iowa and
found to meet city specifications and standards.
As a result of this certification it is recommended that the financial security for public
improvements on file with the City for this subdivision be set at $170,000 for the
remaining work.that includes the water main, sanitary sewer, and two lanes of paving
on relocated Dayton Avenue.
Sidewalks also remain to be completed, but are covered under a separate agreement
that does not require financial security.
I further certify that the quantities of the completed work are as follows:
See attached sheet.
Sincerely,
Paul D. Wie a E.
g
Public Worlcs Director
PDW/dwj
Attachment
cc: City Cleric, Finance, Contractor, PW Administrative Assistant, Construction
Supervisor, Planning SZ Housing Director, Scott Renaud, Fox Engineering, and
Brent Haverkamp, Haverkamp Properties
South Gateway Development, Phase One
June 14, 2002
Page 2
Storm sewer
18" storm sewer Lf. 328
24" storm sewer Lf. 115
Storm sewer inlet structure ea. 4
Sanitary sewer
8" sanitary sewer Lf. 815
Sanitary manhole ea. 5
Water Main
8" water main Lf. 862
Main line valve ea. 4
Hydrant and hydrant valve ea. 4
Pavement
3 Fwide 8" PCC, w/integral curb I.f. 8431