Loading...
HomeMy WebLinkAboutA018 - Letter dated June 14, 2002 certifying completion of utilities and paving Public Works Department ° 515 Clark Avenue, Ames, Iowa 50010 CarirrgPe°'g` Phone 515-239-5160 A Fax 515-239-5404 Qa°(i"Programs Exeep ionaf Service June 14, 2002 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the following utilities and paving required as a condition for approval of the final plat of South Gateway Development, Phase One have been completed in an acceptable manner by McAninch Corporation and Nuck.olls Concrete. The above mentioned improvements have been inspected by the Engineering Division of the Public Worlcs Department of the City of Ames, Iowa and found to meet city specifications and standards. As a result of this certification it is recommended that the financial security for public improvements on file with the City for this subdivision be set at $170,000 for the remaining work.that includes the water main, sanitary sewer, and two lanes of paving on relocated Dayton Avenue. Sidewalks also remain to be completed, but are covered under a separate agreement that does not require financial security. I further certify that the quantities of the completed work are as follows: See attached sheet. Sincerely, Paul D. Wie a E. g Public Worlcs Director PDW/dwj Attachment cc: City Cleric, Finance, Contractor, PW Administrative Assistant, Construction Supervisor, Planning SZ Housing Director, Scott Renaud, Fox Engineering, and Brent Haverkamp, Haverkamp Properties South Gateway Development, Phase One June 14, 2002 Page 2 Storm sewer 18" storm sewer Lf. 328 24" storm sewer Lf. 115 Storm sewer inlet structure ea. 4 Sanitary sewer 8" sanitary sewer Lf. 815 Sanitary manhole ea. 5 Water Main 8" water main Lf. 862 Main line valve ea. 4 Hydrant and hydrant valve ea. 4 Pavement 3 Fwide 8" PCC, w/integral curb I.f. 8431