Loading...
HomeMy WebLinkAbout~Master - Change Order No. 2 on Contract with Minturn, Inc. for Water Pollution Control Facility Structural Rehabilitation Project, Phase 2 RESOLUTION NO. 18-548 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH MINTURN,INC. FOR WATER POLLUTION CONTROL FACILITY STRUCTURAL REHABILITATION PROJECT, PHASE 2 FOR THE CITY OF AMES WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 on contract with Minturn,Inc. of Brooklyn,Iowa,for the Water Pollution Control Facility Structural Rehabilitation Project, Phase 2 be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 25th day of September, 2018. A48,T117-1- yvv�lr 1-J -� Diane R. Voss, City Clerk John--' Haila, Mayor Introduced by: Nelson Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin,Nelson Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 25th day of September, 2018.