Loading...
HomeMy WebLinkAboutA004 - Letter from WHKS to EPA dated May 21, 2001 WHKS & CO. R GE ALD W E LANO,P.E..PRESIDENT 6 CEO PENNY SCHMITZ,EXEC.V.PRES.,COO d CFO FOUAD DAOUD,P.E.6 S.E.,VICE PRES. RICK ENGSTROM,C.E.T.,VICE PRES. ENGINEERS PLANNERS LAND SURVEYORS MICHAEL ZELWSKAS.P.E.VICE PRES CAROL KASTLER,L.S. LAWRENCE BOYER.L.S. 1421 S. BELL,SUITE AMES. IA 50, phone 515-663-9 May 21, 2001 fax 515-663-9 e-mail ames®whks.c Ms. Amy Scott IDNR Field Office #5 401 SW 7th Street, Suite I Des Moines, IA 50309-4611 Re- Northridge Heights (formerly Uthe Farms) Subdivision - First Addition Ames, Iowa WHKS # 5793.07 Dear Ms. Scott: The following information is provided, on behalf of the Uthe Land Development Company LLC, to address comments of Jim Stricker's letter dated May 2, 2001 and our meeting with you, Dennis Schrodt, and Erwin Klaas on May 11, 2001. The following sediment and erosion control measures have been taken to retain sediment on the development property. 1. The temporary sediment basin has been enlarged. Excavation of the basin increased the area and depth, to create approximately 73,500 to 84,000 cubic feet of total storage (based on an average depth of 3.5 to 4 feet). An existing utility line, to be relocated by Qwest, prevents us from enlarging the basin further to the north and east. 2. Silt fence has been installed along the top of the temporary sediment basin berm to protect against sediment leaving the site during overtopping of the berm. 3. Several rows of silt fence have been installed in the ditch along G.W. Carver Avenue, west of Valley View Road, to protect against sediment from the residential lot areas being transported to the temporary sediment basin. 11DeP1%2$Q5793 OAWP�579307a YSCOH4 Iv do OTHER OFFICES P O BOX 1467 MASON CITY.IA SG402 1467 PHONe 641-423-8271 470 CENTRAL AVENUE DUBUOUE.IA 52001 7024 PHONE 319 582-5481 2905 SO BROADWAY ROCHESTER.MN 55904 5515 PHONE 507 288 3923 167 SINSINAWA AVENUE EAST OUBUOUE IL 61025 1218 PHONE 815 747 8833 The following sediment and erosion control measures are planned to retain sediment on the development property. These measures will be completed immediately following fine grading of the residential lot areas by the grading contractor, which is tentatively scheduled for later this week. 4. Silt fence will be installed along the north and east sides of Valley View Road and Bridgeport Drive, to protect against sediment from the residential lot areas being transported to the temporary sediment basin. 5. All disturbed areas south of the contractor access road (future Harrison Road) will be seeded with a temporary stabilization mix. If you have any questions or comments, please contact our office at your convenience. Sincerely, VYHKS a co. Scott A. Williams, P.E. cc: Dennis Schrodt, NRCS, 510 S. 11th St., Nevada, IA 50201 Erwin Klaas, 1405 Grand Ave., Ames, IA 50010 Chuck Winkleblack, Hunziker Land Development Co. Bob Friedrich Jr., Friedrich Land Development Co. I%Deon215797 OAWp%579707a yscottA IV OM