Loading...
HomeMy WebLinkAbout~Master - Change Order No. 1 for engineering services for WPCF Digester, Piping, and Valves Replacement Project RESOLUTION NO. 17-714 RESOLUTION APPROVING CHANGE ORDER NO. 1 FOR ADDITIONAL ENGINEERING SERVICES FOR THE WATER POLLUTION CONTROL FACILITY DIGESTER PUMPS, PIPING,AND VALVES REPLACEMENT PROJECT FOR THE CITY OF AMES WHEREAS, on May 9, 2017, the City Council awarded a contract for engineering services to Strand Associates, Inc., of Madison, Wisconsin, for design of the Water Pollution Control Facility (WPCF) Pump, Piping, and Valve Replacement Project in an amount not to exceed $127,700; and, WHEREAS, during preliminary design, Strand reviewed the applicable building code requirements related to the Digester Complex along with standards set by the National Fire Protection Association (NFPA) for wastewater treatment plants; the overall goal of these standards is to improve workplace safety by providing protection against fire and explosive hazards; and, WHEREAS, the Digester Complex was originally designed and constructed in accordance with the building codes that were in place at the time; based on Strand's review, however, the Complex does not comply with current NFPA and National Electric Doe (NEC) requirements; therefore, Strand has recommended that the City upgrade the electrical system to meet the current code as part of the Pump, Piping, and Valve Replacement Project; and, WHEREAS, a separate Gas Piping and Safety Equipment Replacement project is scheduled for the coming fiscal year (FY 2018/19), and similar code deficiencies will arise when that project is initiated; Strand is recommending that the City also proceed with that separate project at the same time; and, WHEREAS, combining these two projects and addressing the code issues all at once wi71 minimize plant operational issues and help to reduce the overall construction costs; combining the two projects together results in an estimated total project cost of$3,323,000, and this is an increase of approximately $856,000 over what was previously shown in the Capital Improvements Plan; and, WHEREAS, staff has identified savings in the current year from other CIP projects to partially offset the increased project cost in the amount of$604,630; and, WHEREAS, these offsetting reductions will be made as a part of the FY 2017/18 mid-year budget adjustments, and the remaining $251,370 will come from the available Sewer Fund balance; and, WHEREAS, staff has worked with Strand to develop a revised scope of work for the design of the combined project, and the contract change order for Strand to complete the additional engineering design will be an increase of$171,000, bringing its total contract amount to $298,700. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Aries, Iowa, that Change Order No. 1 for additional engineering services to Strand Associates, Inc., of Madison, Wisconsin, for the WPCF Pump, Piping, and Valve Replacement Project in an additional amount not to exceed $171,000 is hereby approved. ADOPTED THIS 19" day of December, 2017. " - ;RNi Diane R. Voss, City Clerk Arm H. Campbell, Mayor Introduced by: Gartin Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin,Nelson, Orazem Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 19' day of December, 2017.