A summary of project costs for site development for purposes of obtaining a bond is as follows:
1. Site Grading including strip &respread topsoil, site cut&fill, and
subgrade compaction for street—McAninch Corporation $48,726
;2. Site Paving including concrete curb &gutter, fine grade subgrade, asphalt
Street, and asphalt bike path—Manatt's Inc. 68 21'9_Y
3! Site Utilities including sanitary sewer, water main, and storm
Sewer—McAninch Coprporation89932'
4. Electrical Distribution including 2" and 4"pvc conduit—Nikkel&Associates 5,290
Street Lighting&Cable by the Ames Municipal Electric System ,�9800`'-.�
6. Miscellaneous Sitework including seeding,construction staking, layout, and testing 20,500
Total $242,467