HomeMy WebLinkAbout~Master - Agreement for WPC Facility Digester Pumps, Valves, and Piping Replacement Project RESOLUTION NO. 17-261
RESOLUTION APPROVING ENGINEERING SERVICES AGREEMENT FOR
WATER POLLUTION CONTROL FACILITY DIGESTER PUMPS, PIPING,AND
VALVES REPLACEMENT PROJECT
FOR THE CITY OF AMES
WHEREAS, a comprehensive evaluation of the mechanical condition of the Water Pollution
Control Facility was performed in 2012; and,
WHEREAS, the end product of that evaluation was a prioritized schedule for the repair or
replacement of key mechanical equipment; based on that prioritized plan, fields were designated in
the Capital Improvements Plan to address mechanical systems in the Digester Complex; and,
WHEREAS, on February 2, 2017, a Request for Proposals (RFP) was issued for design
engineering services for the WPC Facility Digester Pumps, Piping, and Valves Replacement Project,
and on March 21, 2017, staff reviewed five proposals that were submitted; and,
WHEREAS, after a thorough review of each firm's qualifications, Strand Associates, Inc.,
was selected as the most qualified firm.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the Engineering Services Agreement with Strand Associates, Inc., of Madison, Wisconsin, for
the Water Pollution Control Facility Pump, Piping, and Valve Replacement Project in an amount not
to exceed$127,700 is hereby approved.
ADOPTED THIS 9t' day of May, 2017.
Awo J/. 6'a'UVA4a
Diane R. Voss, City Clerk Arm H. Campbell, Mayor
Introduced by: Gartin
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin,Nelson
Voting nay: None Absent: Orazem
Resolution declared adopted and signed by the Mayor this 9t" day of May, 2017.