Loading...
HomeMy WebLinkAboutA008 - Letter to Mayor and Council dated December 15, 1992, certifying completion of sanitary sewer, water main and street paving r l /� CITY OF AMES , I owA 50010 Public Works Department 515 Clark 515-239-5160 A „ December 15, 1992 F! , ,-.;? Honorable Mayor and Council Members 4 DEC 1 6 ! City of Ames Ames, Iowa 50010 -- .............. CITY CLERK CITY OF AMES,IOWA Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, and street paving in Valley East Subdivision, Plat 3 has been completed in an acceptable manner by Rhiner's Plumbing Co. , Construct Inc. , and Manatt's Inc. and has been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT --------------------------------------------------------------------------------- SEE ATTACHMENT PROJECT TOTAL $65,474.32 Sincerely, Paul D. Wiegand,P.E. Public Works Director Approve by: T. Robert Kindred, Assistant City Manager PDW/kg cc: City Clerk, Finance, Contractor, PW Adm. Asst. , PW Const. Supr. AMES — THE CENTER OF IT ALL s ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT ---------------------------------------------------------------------------------- PLAT 3 SANITARY SEWER 1 Connection to existing Ea. 300.00 1.0 300.00 2 8" sewer pipe l.f. 20.25 480.0 9,720.00 3 Manhole Ea. 1315 2.0 2,630.00 TOTAL SANITARY: 12,650.00 WATER MAIN 1 Connection to existing Ea. 300.00 2.0 600.00 2 8" water pipe l.f. 13.00 405.0 5,265.00 3 Install hydrant run Ea. 280.00 1.0 280.00 4 8" x 6" tee Ea. 245.00 1.0 245.00 TOTAL WATER: 6,390.00 STORM SEWER 1 Subgrade preparation s.y. 1.10 3384.0 3,722.40 2 Concrete curb and gutter l.f. 8.45 1846.0 15,598.70 3 Asphalt base, 6.5" s.y. 10.17 2666.0 27,113.22 TOTAL STREET: 46,434.32 GRAND TOTAL: $65,474.32