Loading...
HomeMy WebLinkAboutA019 - Letter to Mayor and Council dated January 13, 1994, certifying completion of sanitary sewer, water main, storm sewer and street construction C�o "ES C I T Y O F A M E S II P.O.BOX 811 AMES IOWA 50010 Community-University-Opportunity Public Works Dept. .. - 515-239-5160 January 13, 1994 AN G CITY CLF;RK 4 CITY OF AMES,IOY-A Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, storm sewer and street construction in Valley East Subdivision have been completed in an acceptable manner by Rhiner Plumbing, Con-Struct, and Manatt's and have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: SEE ATTACHMENT Sincerely, Paul D.Wiegand,P.E. Public Works Director Approved b ,'d Z'-j'j T. R ert Kindred, Assistant City Manager PDW/kg c: City Clerk, Finance, Contractor, PW Admin.Asst. , Construction Supervisor l� Item Description Unit Price Quantity Total Plat I 1 Asphalt Surface S.Y. 2.35 5,128.0 12,050.80 Plat 2 2 Asphalt Surface S.Y. 2.35 2,666.0 6,265.10 Plat 3 3 Asphalt Surface S.Y. 2.26 1,541.0 3,482.66 Plat 4 Sanitary Sewer 4 8" Sanitary sewer l.f. 21.00 442.0 9,282.00 5 Sanitary sewer manhole ea. 1,315.00 2.0 2,630.00 Water Main 6 8" Water main l.f. 15.00 506.0 7,590.00 7 6" Water main l.f. 14.00 120.0 1,680.00 8 Fire hydrants ea. 280.00 2.0 560.00 9 8" x 6" tee ea. 245.00 2.0 490.00 10 8" x 6" reducer ea. 145.00 1.0 145.00 11 8" 45° bend ea. 145.00 1.0 145.00 12 8" 22-j° bend ea. 145.00 1.0 145.00 Storm Sewer 13 12" RCP l.f. 17.00 136.0 2,312.00 14 Open throat intake ea. 1,500.00 1.0 1,500.00 Street Paving 15 Subgrade preparation S.Y. 1.10 3,424.0 3,766.40 16 30" PCC curb and gutter l.f. 8.75 1,035.0 9,056.25 17 Asphalt base S.Y. 10.17 3,021.0 30,723.57 $91,823.78