HomeMy WebLinkAboutA008 - Letter dated February 11, 1991 certifying completion of 1990 utility construction I'i""iill CITY OF AMES , I OWA 500,
_ II
Public Works Department
ALL-ANIEFV A CffY 515 Clark
1982-1983 515-239-
Februar 11, 199FILED
FEB 2 7 1991
Honorable Mayor and Council Members
City.of Ames OIN CLER}C
Ames, Iowa 50010 CITY OF AMfS,IO' A.Y
Ladies and Gentlemen: .
I hereby certify that the 1990 Utility Construction in Stoner ce S d 7-z�% has
been completed in an acceptable manner by Ames Trenching Inc. , Con-Struct Inc. and
Manatt's Inc. , all of Ames, Iowa and has been inspected by the Engineering
Division of the Public Works Department of the City of Ames, Iowa.
I further certify that, the quantities of the completed work are as follows:
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
-----------------------------------------------------------------=---------------
SEE ATTACHMENT
Sincerely,
Paul D. Wiegantl,P.E.
Public Works Director
Approved by:
T. obert Kin red, Assistant City Manager
PDkI/kg
cc: City Clerk, Finance, Contractor, Public Works Admin. Asst. , Public Works, and
Construction Supervisor
AMES — THE CENTER OF IT ALL
1990 Utility Construction in StoneBrooke Subdivision
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
----------------------------------------------------------------------------------
3RD ADDITION - .STREETS
1 Asphalt Surface Ton 29.80 173.2 5,161.36
------------
$5,161.36
4TH ADDITION - SANITARY
1 Manholes (on 24" main) EA. 1,600.00 4.0 6,400.00
2 Manholes (,on 8" main) EA. 900.00 3.0 2,700.00
3 8" Truss Pipe L.F. 19.00 571.0 10,849.00
4 24" R.C.P. L.F. 40.00 913.0 36,520.00
------------
$56,469.00
4TH ADDITION - WATER
1 8" P.V.C. L.F. 12.00 605.0 7,260.00
2 8" x 8" x 6" Tee EA. 150.00 2.0 300.00
3 8" Gate Valve & Box EA. 580.00 1.0 580.00
`4 Hydrant Installation EA. 100.00 2.00 200.00
5 Wall Pipe Reaction Block EA. 100.00 1.00 100.00
88,440.00
4TH ADDITION:- STORM
1 12" R.C.P. L.F. 13.00 68.0 884.00
2 18" R.C.P. L.F. 20.00 468.0 9,360.00
3 27" R.C..P. L.F. 40.00 92.0 3,680.00
4 Intakes, Open Throat EA. 800.00 5.0 4,000.00
5 Rip-Rap at Outlet Ton 20.00 15.0 300.00
------------
$18,224.00
4TH ADDITION - STREETS
1 Curb & Gutter L.F. 8.25 857.0 7,070.25 '
2 Asphalt Base Ton 27.42 307.9 8,442.62
515 .512.8? "
Grand Total: $103,807.23