January 8, 1988
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the sanitary sewer, storm sewer, and water main
extensions in Stonebrooke Subdivision, 2nd Addition have been completed in
an acceptable manner by Con-Struct, Inc. of Ames, Iowa and has been
inspected by the Engineering Division of the Public Works Department of the
City of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
ITEM DESCRIPTION QUANTITY UNITS AMOUNT
Sanitary Sewer
1 . Manhole 2 each $ 7,500.00
2. 8" P.V.C. Truss Pipe 163 l .f. 3,056.25
Sanitary Total $ 10,556.25
Water Main
3. 8" P.V.C. 440 l .f. $ 4,887.50
4. Bends 3 each 345.00
5. Tee 1 each 250.00
6. 8" Gate Valve and Box 1 each 430.00
7. Hydrant Installation 1 each 750.00
8. Wall Pipe Reaction Block 1 each 500.00
9. Flushing and Purification 1 each 500.00
Water Total $ 7,662.
AMES--THE CENTER OF IT ALL
D
Page 2
January 8, 1988
Certification Letter Stonebrooke
ITEM DESCRIPTION QUANTITY UNITS AMOUNT
Storm Sewer
10. 12" R.C.P. 478 l .f. $ 5,352.00
11. 21" R.C.P. 120 l .f. 2,106.00
12. Open Throat Intake 4 each 4,800.00
13. RA-6 1 each 2,200.00
14. 21" Flared End Section 1 each 300.00
15. 21" 45 degree Bend 1 each 300.00
16. Rip-Rap 30 ton 800.00
Storm Total 15,85
GRAND TOTALS $ 34,076.75
� /0
. Chantland, P.E.
Public Works Director
Approved by:
Steven L. Schainker, City Manager
AOC/ch
cc: Finance, Con-Struct, Public Works Admin. Assistant, Public
Works,`construction Supervisor, Stonebrooke Partnership, and
Engineering Plus