HomeMy WebLinkAbout~Master - Change Order No. 1 for Power Plant Unit #8 Feedwater Pump Inspection and Repair RESOLUTION NO. 16-689
RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH
SUPERIOR INDUSTRIAL EQUIPMENT
FOR POWER PLANT UNIT NO. 8 FEEDWATER PUMP INSPECTION AND REPAIR
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 1 on contract with Superior Industrial Equipment of Grimes, Iowa, for the
Power Plant Unit No. 8 Feedwater Pump Inspection and Repair be approved and adopted as attached
hereto and made a part hereof by this reference.
ADOPTED THIS 29th day of November, 2016.
f -1 a& A.
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Gartin
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corneri, Gartin,Nelson, Orazem
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 29th day ofNovember, 2016.