Loading...
HomeMy WebLinkAboutA011 - Letter dated September 20, 1988 certifying completion of sanitary sewer, storm sewer, water main, and street construction AMES ' 11o ' CITY OF AMES , sown/'� 50010 ALL-AMEMICA CffY Sept mber72 ",,E�' 1982-1983 Honorable Mayor and Council Members OCT 3 IM City of Ames Ames, Iowa 50010 CITY CLERK CITY OF AMES, IOVIA Ladies 'and Gentlemen: I hereby certify that the sanitary sewer, storm sewer, water main, and street construction in Spring Valley Subdivision, 3rd, 4th, 5th, and 6th Additi..ons has been completed in an acceptable manner by Des Moines Asphalt and Paving of Des Moines, Jerry Johnson' Excavation of Jewell , R.D. Gammon Constructors of Ames, Con-Struct Inc, of Ames, and Manatts of Ames, Iowa and has been inspected. by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: ADD. ITEM: DESCRIPTION: QUANTITY: UNIT: AMOUNT 7rd- -EFT CONSTRUCTION 1. Asphalt Surface 94 ton $ 3,013.50 SUBTOTAL 3,0R T-50 4th STREET CONSTRUCTION 1 . Asphalt Surface 391 ton $ 7,587.84 5th SANITARY SEWER SUBTOTAL $ 7,587.M 1 . Manhole 1 each $ 1,860.00 2. 8" Diameter Truss Pipe 170 l .f. 3400.00 WATER MAIN ' 3. 6 Diameter PVC Pipe 250 l .f, 2,120.00 4. 6" 22 112 degree bend & block 6 each 612.00 5. 6" x 6" tee 1 each 178.00 6. 6" Gate Valve and box 1 each 379.00 7. Set Hydrant, valve and box 1 each 300.00 STORM SEWER 8. 15" RCP 224 l .f. 3,864.00 9. 12" RCP 190 l .f. 3,002.00 10. 15" FES 1 each �264.00 11. 15" RCP 45 degree bend 1 each 265.00 12. Manhole 2 each 2,100.00 13. Intake 2 each 2,140.00 STREET CONSTRUCTION 14. PCC Curb and Gutter 883 l .f. 6,931 .55 15. Asphalt Base 414 tons 10,350.00 SUBTOTAL AMES - THE CENTER OF IT ALL Certification Letter Spring Valley Page 2 September 20, 1988 ADD. ITEM: DESCRIPTION: QUANTITIY: UNIT: AMOUNT: Zt- =ARY SEWER 1 . Manhole 8 each $12,000.00 2. 8" Diameter Truss Pipe 911 l .f. 20,438.00 WATER MAIN 3. 8" PVC Water Main 569 l .f. 6,865.50 4. 6" PVC Water Main 684 l .f. 6,989.40 5. 22 1/2 degree bend 4 each 400.00 6. 8" x 8" x 6" Tee 3 each 450.00 7. 6" x 6" x 6" Tee 3 each 420.00 8. 6" M.J. Sleeve 1 each 65.00 9. 8" M.J. Sleeve 1 each 65.00 10. 6" Gate Valve and Box 2 each 700.00 Hydrant Installation 4 each 600.00 12. Wall Pipe Reaction Block 1 each 100.00 STORM SEWER 13. 12" RCP 1 ,063 l .f. 12,752.00 14. 18" RCP ill l .f. 1 ,932.00 15. Intake 6 each 5,400.00 16. 12" FES 1 each $ 100.00 SUBTOTAL $69,276.M TOTAL $117,643.79 Sincerely, D. Paul D. Wiegand, P.E. Public Works Director Approved by: Steven L. Schainker, City Manager PDW/ch cc: y C1'erk}, Finance, Contractors, Public Works Admin. Assistant, PubliY`c orks, Construction Supervisor