Loading...
HomeMy WebLinkAbout~Master - Transfer funds from WPC Decant Line Replacement Project to WPC Administration Building HVAC System Project RESOLUTION NO. 16-546 RESOLUTION APPROVING TRANSFER OF FUNDS FOR WATER POLLUTION CONTROL ADMINISTRATION BUILDING HVAC PROJECT FOR THE CITY OF AMES WHEREAS, the Water Pollution Control (WPC) Facility's heating, ventilation, and air conditioning(HVAC)system serving the Administration Building provides ventilation and seasonal heating and cooling to the space; and, WHEREAS,the Administration Building houses the computer system used to monitor and operate the plant and is staffed around the clock, and the HVAC system was installed in 1989 and has reached the end of its useful life; and, WHEREAS, bids have received for this project, and the contract is awarded to Wolin & Associates of West Des Moines, Iowa, in the amount of$363,020.00; and, WHEREAS, this project was included in the FY 2015/16 Capital Improvements Plan at $345,000 as part of the WPC Mechanical and HVAC Replacement Project; and, WHEREAS, savings from the WPC Decant Line portion of the Residuals Handling Project are available to provide the total project budget needed. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that authorization to transfer $80,000 in savings from the WPC Decant Line Replacement Project to the WPC Administration Building HVAC Project is hereby approved. ADOPTED THIS 13`h day of September, 2016. _ 1144loo Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Orazem Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin,Nelson, Orazem Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 13`h day of September, 2016.