Loading...
HomeMy WebLinkAboutA020 - Council Action Form dated June 27, 1989 z � COUNCIL ACTION FORM Item # Date: dune 27, 1989 SUBJECT: Accepting Subdivision Improvements (street paving and utilities) in Southwood Subdivision. BACKGROUND: Armstrong Construction Co. has satisfactorily completed the street paving, storm sewer, sanitary sewer, and water main on Buckeye Avenue and Chestnut Street. All of these improvements are in Southwood Subdivision 1st filing. South Duff Development Partnership is the owner of the subdivision. These improvements were constructed in accordance with the City of Ames standard construction specifications and the Public Works staff recommends the acceptance of all of these improvements for public use. MANAGER'S RECOMMENDED ACTION: It is recommended by the City Manager that the City Council accept the street and utility improvements installed in Southwood Subdivision 1st filing. COUNCIL ACTION• AMC�:S r CITY OF AMES , IOWA 50010 ii ALL-AMERCq MY June 15 , 1989 M2-1983 Honorable Mayor and Council Members City of Ames Ames, IA 50010 Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, - storm sewer, and street construction work in the Southwood subdivision has been completed in an acceptable manner by Armstrong Co. of Ames, Iowa and has been inspected by the Engineering Division of the Public Works Department of the City of Ames , Iowa. I further certify that the quantities of the completed work are as follows : ITEM: DESCRIPTION: QUANTITY: UNITS : AMOUNT: 1 . 8 " Sanitary sewer pipe 1 , 581 l .f . $23 , 715 . 00 2 . 48" Manhole 5 each 5 ,000 . 00 3 . Special Manhole 1 each 2 , 500 . 00 4 . 8" pipe plug 1 each 50 . 00 5 . Embedment Rock 333 . 67 tons 4 ,337 . 71 TOTAL SANITARY SEWER $35 ,602 . 71 1 . 8 ". Water Main 2 , 210 l . f . $25 ,440 . 00 2 . 12"x18" tapping valve 1 each 1 , 500 . 00 3 . 8"x6" Tee 4 each 1, 180 . 00 4 . Install Hydrants 4 each 1 , 800. 00 5 . Reaction Block 1 each 150 . 00 6 . 8" M.J. Gate Valve & Box 1 each 500 . 00 7 . 8" M. J. 22 . 5 degree Bend 2 each 350 . 00 S . 8" M.J. 45 degree Bend . 1 each 175 . 00 9 . 1411x8" Tapping Valve & Sleeve 1 each 2 , 500 . 00 10 . 8" M.J. Tee 1 each 300 . 00 TOTAL WATER $33 , 895 . 00 AMES — THE CENTER OF IT ALL Certification Letter Southwood Subdivision Page 2 1 . Intakes 11 each $ 8, 800 . 00 2 . Standard 54" Manhole 1 each 1 , 812 . 29 3 . 12" RCP 582 l . f . 7 , 158 . 60 4 . 15" RCP 400 l . f. 6 , 000 . 00 5 . 21" RCP 767 . 5 l . f . 17 , 845 . 45 6 . 36" RCP 80 l . f . 3 , 520 . 00 7 . 36" RCP end section 1 each 500 . 00 8 . 4 ' x41x6" curtainwall 1 each 495 . 00 9 . Shot Rock Rip-Rap 1.06 . 14 tons 2 , 653 . 50 TOTAL STORM SEWER $48 , 784 . 84 1 . Excavation 15 ,759 c .y. $15 , 759 . 00 2 . 8" P .C.C. Pavement 7 , 821 s .y. 123 , 571 . 80 3 . Saw Concrete 115 l . f . 345 .00 4 . Remove Concrete 44 S .Y. 352 . 00 5 . Dowel D. tie bars 47 each 564 . 00 6 . Adjust Manhole 6 each 780 . 00 7 . Adjust Water Valve 3 each 225 . 00 8 . Adjust Intakes 11 each 1 , 375 . 00 TOTAL STREET CONSTRUCTION $142 , 971 . 80 TOTALS $261 , 254 .35 Sincerely, Paul D. Wiegand, P.E . Public Works Director Approved by: Steven L. Schainker, City Manager PDW/ch cc : City Clerk, Finance, Contractor, Public Works Admin. Asst. , Public Works , and Construction Supervisor