Armstrong Construction Co. has satisfactorily completed the street paving,
storm sewer, sanitary sewer, and water main on Buckeye Avenue and
Chestnut Street. All of these improvements are in Southwood Subdivision
1st filing.
South Duff Development Partnership is the owner of the subdivision.
These improvements were constructed in accordance with the City of Ames
standard construction specifications and the Public Works staff recommends
the acceptance of all of these improvements for public use.
MANAGER'S RECOMMENDED ACTION:
It is recommended by the City Manager that the City Council accept the
street and utility improvements installed in Southwood Subdivision 1st
filing.
COUNCIL ACTION•
AMC�:S
r CITY OF AMES , IOWA 50010
ii
ALL-AMERCq MY June 15 , 1989
M2-1983
Honorable Mayor and Council Members
City of Ames
Ames, IA 50010
Ladies and Gentlemen:
I hereby certify that the sanitary sewer, water main, - storm
sewer, and street construction work in the Southwood
subdivision has been completed in an acceptable manner by
Armstrong Co. of Ames, Iowa and has been inspected by the
Engineering Division of the Public Works Department of the
City of Ames , Iowa.
I further certify that the quantities of the completed work
are as follows :
ITEM: DESCRIPTION: QUANTITY: UNITS : AMOUNT:
1 . 8 " Sanitary sewer pipe 1 , 581 l .f . $23 , 715 . 00
2 . 48" Manhole 5 each 5 ,000 . 00
3 . Special Manhole 1 each 2 , 500 . 00
4 . 8" pipe plug 1 each 50 . 00
5 . Embedment Rock 333 . 67 tons 4 ,337 . 71
TOTAL SANITARY SEWER $35 ,602 . 71
1 . 8 ". Water Main 2 , 210 l . f . $25 ,440 . 00
2 . 12"x18" tapping valve 1 each 1 , 500 . 00
3 . 8"x6" Tee 4 each 1, 180 . 00
4 . Install Hydrants 4 each 1 , 800. 00
5 . Reaction Block 1 each 150 . 00
6 . 8" M.J. Gate Valve & Box 1 each 500 . 00
7 . 8" M. J. 22 . 5 degree Bend 2 each 350 . 00
S . 8" M.J. 45 degree Bend . 1 each 175 . 00
9 . 1411x8" Tapping Valve & Sleeve 1 each 2 , 500 . 00
10 . 8" M.J. Tee 1 each 300 . 00
TOTAL WATER $33 , 895 . 00
AMES — THE CENTER OF IT ALL
Certification Letter
Southwood Subdivision
Page 2
1 . Intakes 11 each $ 8, 800 . 00
2 . Standard 54" Manhole 1 each 1 , 812 . 29
3 . 12" RCP 582 l . f . 7 , 158 . 60
4 . 15" RCP 400 l . f. 6 , 000 . 00
5 . 21" RCP 767 . 5 l . f . 17 , 845 . 45
6 . 36" RCP 80 l . f . 3 , 520 . 00
7 . 36" RCP end section 1 each 500 . 00
8 . 4 ' x41x6" curtainwall 1 each 495 . 00
9 . Shot Rock Rip-Rap 1.06 . 14 tons 2 , 653 . 50
TOTAL STORM SEWER $48 , 784 . 84
1 . Excavation 15 ,759 c .y. $15 , 759 . 00
2 . 8" P .C.C. Pavement 7 , 821 s .y. 123 , 571 . 80
3 . Saw Concrete 115 l . f . 345 .00
4 . Remove Concrete 44 S .Y. 352 . 00
5 . Dowel D. tie bars 47 each 564 . 00
6 . Adjust Manhole 6 each 780 . 00
7 . Adjust Water Valve 3 each 225 . 00
8 . Adjust Intakes 11 each 1 , 375 . 00
TOTAL STREET CONSTRUCTION $142 , 971 . 80
TOTALS $261 , 254 .35
Sincerely,
Paul D. Wiegand, P.E .
Public Works Director
Approved by:
Steven L. Schainker, City Manager
PDW/ch
cc : City Clerk, Finance, Contractor, Public Works Admin.
Asst. , Public Works , and Construction Supervisor