HomeMy WebLinkAboutA022 - Letter dated January 3, 2003 regarding installation of sidewalks Public Works Department
ca.�„�r�q,u
515 Clark Avenue, Ames, Iowa 50010
Qhatiyr,asm„. Phone 515-239-5160 A Fax 515-239-5404
E.vrprfaual Vemrr
January 3, 2003
Maggie Sevde
Sevde Relocations
1102 Southern Hills Drive
Aires, Iowa 50010
Dear Maggie:
Re: Installation of sidewalks — Southern Hills Industrial Park, Second Addition
Thank you for directing ire to examine the resolution approving the Final Plat for
Southern Hills Industrial Park Second Addition regarding the issue of installing
sidewalks on both side of Southern Hills Drive.
As you indicated on May 25, 1999 the City Council passed resolution No. 99-182
approving the final plat of Southern Hills Industrial Park Second Addition. This
resolution required that sidewalks be installed only on the north side of the
development with the stipulation that if the lots on the south side were redeveloped,
sidewalks on the south side would also be installed.
Therefore it appears that sidewalks along Lots 1 and 5 are missing.
Again, these sidewalks need to be installed as soon as weather will allow but must be
completed prior to May 1, 2003.
Sincerely,
Jerald N. Byg, P.E.
Municipal Engineer
JNB/dwj
Enclosure.
cc: Paul Wiegand, Public Works Director
Scott Renaud, Fox Engineering
Brian O'Connell, Planning S& Housing Director