Loading...
HomeMy WebLinkAboutA022 - Letter dated January 3, 2003 regarding installation of sidewalks Public Works Department ca.�„�r�q,u 515 Clark Avenue, Ames, Iowa 50010 Qhatiyr,asm„. Phone 515-239-5160 A Fax 515-239-5404 E.vrprfaual Vemrr January 3, 2003 Maggie Sevde Sevde Relocations 1102 Southern Hills Drive Aires, Iowa 50010 Dear Maggie: Re: Installation of sidewalks — Southern Hills Industrial Park, Second Addition Thank you for directing ire to examine the resolution approving the Final Plat for Southern Hills Industrial Park Second Addition regarding the issue of installing sidewalks on both side of Southern Hills Drive. As you indicated on May 25, 1999 the City Council passed resolution No. 99-182 approving the final plat of Southern Hills Industrial Park Second Addition. This resolution required that sidewalks be installed only on the north side of the development with the stipulation that if the lots on the south side were redeveloped, sidewalks on the south side would also be installed. Therefore it appears that sidewalks along Lots 1 and 5 are missing. Again, these sidewalks need to be installed as soon as weather will allow but must be completed prior to May 1, 2003. Sincerely, Jerald N. Byg, P.E. Municipal Engineer JNB/dwj Enclosure. cc: Paul Wiegand, Public Works Director Scott Renaud, Fox Engineering Brian O'Connell, Planning S& Housing Director