Loading...
HomeMy WebLinkAbout~Master - Completion of Methane Engine - Generator Set No. 2 Rehabilitation Project at WPC Facility RESOLUTION NO. 15-731 RESOLUTION ACCEPTING COMPLETION OF METHANE ENGINE-GENERATOR SET NO. 2 REHABILITATION PROJECT AT WATER POLLUTION CONTROL FACILITY FOR THE CITY OF AMES,IOWA WHEREAS, Barr Engineering Company, consulting engineer, has filed a certificate of completion for the Methane Engine-Generator Set No. 2 Rehabilitation Project at the Water Pollution Control facility for the City of Ames,Iowa,in accordance with a contract dated August 27, 2013,by and between the City of Ames, Iowa, and Ziegler Power Systems of Altoona, Iowa. NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of Ames, Iowa, as follows: Section 1. The total contract for the Methane Engine-Generator Set No.2 Rehabilitation Proj ect at the Water Pollution Control facility has been fully completed by the Contractor in accordance with the terms of the contract and is hereby accepted and approved. Section 2. The total cost of the contract is $176,608.00. Section 3. The amount due Ziegler Power Systems of Altoona,Iowa,is hereby ordered paid as provided by law. Section 4. All resolutions or orders or parts thereof in conflict herewith are hereby repealed to the extent of such conflict. ADOPTED THIS 8th day of December, 2015. t"'R 1) A. C�AAA'V Iiii-e . 6t�aw Diane . Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Nelson Seconded by: Goodman Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 8t' day of December, 2015.