HomeMy WebLinkAboutA017 - Letter dated September 29, 1981 certifying completion of street construction September 29, 1981 F L CrZy o,F,�:��.iowq Honorable Mayor and Council Members City of Ames ACT, Ames , Iowa 50010 6 �981 Ladies and Gentlemen: I hereby certify that the street construction on Ontario Street to a point 22 feet west of the west line of Lot 32 and on Indiana Avenue to a point 9 feet north of the north line of Lot 27, all in Patio Homes West First Addition to Ames, Iowa, has been completed in an acceptable manner by Iowa Road Builders of Des Moines, Iowa, in accordance with the plans and specifications of the City of Ames, Iowa, and has been inspected by the Engineering Division of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: Work Performed for 1979 prices: Unit Item - Description Quantity Unit Price Amount 1. Concrete curb and gutter 602 l .f. $ 5.80 $ 3,491•.60 2. Subbase preparation 1104 S.Y. 0.45 ' 496.80 3. Asphalt base 301 ton 22.00 6,622.00. 4. Asphalt surface 97 ton 32. 50 3,152. 50 5. Prime and tack 121 gal . 0. 90 108. 90 6. Intake adjustment 2 each 90.00 180.00 7. Quick lime 11 ton 117.00 1 ,287. 00 TOTAL $ 15,338.80 Work Performed for 1981 prices : 1. Concrete curb & gutter 499 l .f. 7.00 3,493.00 2'. Asphalt base 649 ton 25. 50 16,549. 50 3. Asphalt surface 298 ton 34.30 10,221.40 4. Prime and tack 290 gal 1.25 362. 50 5. Intake adjustment 2 each 90.00 180.00 6. Water valve adjustment 1 each 95.00 95.00 7. Manhole adjustment 2 each 125.00 250.00 8. End loader time 8 hours 60.00 480.00 9. Blade time 8 hours 65.00 520.00 10. Truck time 42 hours 35.00 157. 50 TOTAL $ 32,308.90 GRAND TOTAL $ 47,647. 70 i Honorable Mayor and Council Members September 29, 1981 Page Two City' s share for the difference in the cost of 45 foot width street over 31 foot width street. Unit Item Description Quantity Unit Price Amount 2. Asphalt base 419 ton $ 25.50 $ 10,684.50 3. Asphalt surface 189. 3 ton 34.30 6,492.99 4. Prime and tack 181 gal . 1.25 226.25 Total $ 17,403. 74 Sinc ely, . C n land, P.E. Public Works Director - pr ved By: Jo Elwell , ity/tanager /dj cc: H & F Builders Iowa Road Builders Finance Department Public Works Department ity P1anager's Offic