HomeMy WebLinkAboutA017 - Letter dated September 29, 1981 certifying completion of street construction September 29, 1981 F L
CrZy o,F,�:��.iowq
Honorable Mayor and Council Members
City of Ames ACT,
Ames , Iowa 50010 6 �981
Ladies and Gentlemen:
I hereby certify that the street construction on Ontario Street to a point 22
feet west of the west line of Lot 32 and on Indiana Avenue to a point 9 feet
north of the north line of Lot 27, all in Patio Homes West First Addition to
Ames, Iowa, has been completed in an acceptable manner by Iowa Road Builders of
Des Moines, Iowa, in accordance with the plans and specifications of the City
of Ames, Iowa, and has been inspected by the Engineering Division of the City
of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
Work Performed for 1979 prices:
Unit
Item - Description Quantity Unit Price Amount
1. Concrete curb and gutter 602 l .f. $ 5.80 $ 3,491•.60
2. Subbase preparation 1104 S.Y. 0.45 ' 496.80
3. Asphalt base 301 ton 22.00 6,622.00.
4. Asphalt surface 97 ton 32. 50 3,152. 50
5. Prime and tack 121 gal . 0. 90 108. 90
6. Intake adjustment 2 each 90.00 180.00
7. Quick lime 11 ton 117.00 1 ,287. 00
TOTAL $ 15,338.80
Work Performed for 1981 prices :
1. Concrete curb & gutter 499 l .f. 7.00 3,493.00
2'. Asphalt base 649 ton 25. 50 16,549. 50
3. Asphalt surface 298 ton 34.30 10,221.40
4. Prime and tack 290 gal 1.25 362. 50
5. Intake adjustment 2 each 90.00 180.00
6. Water valve adjustment 1 each 95.00 95.00
7. Manhole adjustment 2 each 125.00 250.00
8. End loader time 8 hours 60.00 480.00
9. Blade time 8 hours 65.00 520.00
10. Truck time 42 hours 35.00 157. 50
TOTAL $ 32,308.90
GRAND TOTAL $ 47,647. 70
i
Honorable Mayor and Council Members
September 29, 1981
Page Two
City' s share for the difference in the cost of 45 foot width street over 31
foot width street.
Unit
Item Description Quantity Unit Price Amount
2. Asphalt base 419 ton $ 25.50 $ 10,684.50
3. Asphalt surface 189. 3 ton 34.30 6,492.99
4. Prime and tack 181 gal . 1.25 226.25
Total $ 17,403. 74
Sinc ely,
. C n land, P.E.
Public Works Director
- pr ved By:
Jo Elwell , ity/tanager
/dj
cc: H & F Builders
Iowa Road Builders
Finance Department
Public Works Department
ity P1anager's Offic