HomeMy WebLinkAboutA008 - Letter dated January 16, 1981 certifying completion of sanitary sewer, storm sewer, and water main construction i
January 16, 1981
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen :
I hereby certify that the sanitary sewer, storm sewer and water main construc-
tion on Buchanan Drive and Eisenhower Drive North in Eighteenth Addition to
Parkview Heights Subdivision of Ames, Iowa has been completed in an acceptable
manner in accordance with the plans and specifications of the City of Ames,
Iowa and inspected by the Engineering Department of the City of Ames, Iowa.,
'
I further certify that the quantities of the completed work are as follows :
Unit
Item Description Quantity Unit Price Amount
Sanitary Sewer
1. 8" vitrified clay pipe 813 l. f. $ 13.50 $ 10,975.00
2. Standard manhole 2 each 1,050.00 2,100.00
3. Embedment rock 123 ton 10.00 1,230.00
Total Sanitary Sewer $ 14,305.00
Storm Sewer
4. 18" Reinforced concrete pipe 157 l . f. $ 16.20 $ 2,543.40
5. 15" Reinforced concrete pipe 147 l . f. 12.90 1,896. 30
6. 12" Reinforced concrete pipe 341 l. f. 11. 55 3,938.55
7. Standard intake 6 each 860.00 5,160.00
8. Standard manhole 1 each 875.00 875.00
9. Rebuild standard intake 1 each 480.00 480.00
10. Embedment rock 32 ton 10.00 320.00
Total Storm Sewer $ 15,213.25
Water Main
11. 16" Ductile iron pipe 655 l. f. $ 22. 82 $ 14,947. 10
12. 6" ductile iron pipe 155 l . f. 9.51 1,474.05
13. 1611x6" anchoring tee 2 each 580.00 1,160.00
14. 6" anchoring coupling 2 each 105.00 210.00
15. 16" sleeve 1 each 253.00 253.00
16. Embedment rock 41 tons 10.00 410.00
Total Water Main $ 18,454. 15
Grand Total $ 47,972.40
Honorable Mayor and Council Members
Page Two
January 16, 1981
City' s share for the difference in the cost of the water main over six inches
in diameter:
Unit
Item Description Quantity Unit Price Amount
11. Ductile iron pipe 655 l.f. $ 13. 31 $ 8,718.05
13. 16"W' anchoring tee 2 each 420.00 840.00
15. 16" Sleeve 1 each 100.00 100.00
Total $ 9,658.05
Sincerely, J
j ( �A,(
.0. Chantland, P.E.
1 Public Works Director
�Ap• roved By.
A:c ;
Iry it
Jo h Elwell , City. M na'gdr
AO /d'
cc: H & F Builders, Inc.
Buck Construction
Friedrich Construction
Finance Department