Loading...
HomeMy WebLinkAboutA002 - Letter dated May 13, 1980 certifying completion of water main construction May 13, 1980 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the water main construction on Buchanan Drive from Eisenhower Avenue'south to Eisenhower Avenue north in Eighteenth Addition to Parkview Heights Subdivision of Ames, Iowa has been completed in' an acceptable manner in accordance with the plans and specifications of the City of Ames, Iowa and inspected by the Engineering Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows : Unit Item Description Quantity Unit Price Amount 1. 16", ductile iron pipe 212 l .f. $ 18.50 $ 3,922.00 2. 16" x 16" Tee 2 each 546.00 1,092.00 3. 1611' x 6" reducer 2 each 190.00 380.00 4. 16" pipe plug 1 each 110.00 110.00 5. 16" butterfly valve & box 1 each 1340.00 1,340.00 6. 6"cast iron pipe 60 l .f. 7.50 450.00 7. 6" gate valve & box 1 each 270.00 270.00 8. 6" x 6" tee 1 each 110.00 110.00 9. 6" .pipe plug 1 each 64.00 64.00 Total $ 7,738.00 City's share for the difference in the cost of the water main over six inches in diameter: Unit Item Description Quantity Unit Price Amount 1. 16".-ductile iron pipe 212 1'.f. $ 11.00 $ 2,332.00 2. 16" x 16" tee 2 each 436.00 872.00 3. 16" x 6" reducer 2 each 190.00 380.00 4. 16" pipe plug 1 each 46.00 46.00 5. 16" butterfly valve & box 1 each 1070.00 1,070.00 Total $ 4,700.00 W/ery s, ApIrved Byz n and, P.E. Public Works Director i John EMI , t1tf Mana Or cc: & F. Builders, Inc. ; Buck Construction; Friedrich Construction; Finance Dept. nnrria; �/5/gp .z�.a isd, ak. r . Cw,.0 �