HomeMy WebLinkAboutA002 - Letter dated May 13, 1980 certifying completion of water main construction May 13, 1980
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the water main construction on Buchanan Drive from
Eisenhower Avenue'south to Eisenhower Avenue north in Eighteenth Addition
to Parkview Heights Subdivision of Ames, Iowa has been completed in' an
acceptable manner in accordance with the plans and specifications of the
City of Ames, Iowa and inspected by the Engineering Department of the City
of Ames, Iowa.
I further certify that the quantities of the completed work are as follows :
Unit
Item Description Quantity Unit Price Amount
1. 16", ductile iron pipe 212 l .f. $ 18.50 $ 3,922.00
2. 16" x 16" Tee 2 each 546.00 1,092.00
3. 1611' x 6" reducer 2 each 190.00 380.00
4. 16" pipe plug 1 each 110.00 110.00
5. 16" butterfly valve & box 1 each 1340.00 1,340.00
6. 6"cast iron pipe 60 l .f. 7.50 450.00
7. 6" gate valve & box 1 each 270.00 270.00
8. 6" x 6" tee 1 each 110.00 110.00
9. 6" .pipe plug 1 each 64.00 64.00
Total $ 7,738.00
City's share for the difference in the cost of the water main over six inches in
diameter:
Unit
Item Description Quantity Unit Price Amount
1. 16".-ductile iron pipe 212 1'.f. $ 11.00 $ 2,332.00
2. 16" x 16" tee 2 each 436.00 872.00
3. 16" x 6" reducer 2 each 190.00 380.00
4. 16" pipe plug 1 each 46.00 46.00
5. 16" butterfly valve & box 1 each 1070.00 1,070.00
Total $ 4,700.00
W/ery s,
ApIrved Byz n and, P.E.
Public Works Director
i
John EMI , t1tf Mana Or
cc: & F. Builders, Inc. ; Buck Construction; Friedrich Construction; Finance Dept.
nnrria;
�/5/gp
.z�.a isd, ak. r .
Cw,.0 �