Loading...
HomeMy WebLinkAboutA022 - Council Action Form dated February 13, 1990 ITEM #: DATE: 02/13/90 COUNCIL ACTION FORM SUBJECT: Resolution Approving a Conceptual Development Plan for Or`cl a-Vb E"sf=a BACKGROUND: The proposed Conceptual Development Plan for the Orchard Estates Fourth Addition is required because this plan depicts a change in the proposed development from the approved preliminary plat for this area which was approved in 1972. At that time, this property was shown as .the site for a future PUD under the R-2 zoning regulations. This seven (7) lot single-family residential subdivision on a 4.81 acre site is located north of the Chicago and North Western Railroad tracks and east of Minnesota Avenue. This proposed subdivision will complete the platting of the Orchard Estates development which is located east of Scholl Road and north of the Chicago and North Western Railroad. At the present time this site is vacant, and it contains a drainage channel and some wooded vegetation. ANALYSIS: LUPP: The Land Use Policy Plan (LUPP) designates this area as suitable for low-density residential. Zoning: This property is currently zoned R1-10 (Low-Density Residen- tial). The proposed lot sizes are consistent with the 10,000 square foot minimum lot size required in the R1-10 zoning district. The lots range in size from approximately 17,000 square feet to 51,000 square feet. The gross density for the entire development is 1.46 d.u./acre. A drainage channel penetrates a portion of Lot 3, which affects the amount of buildable area. It is possible to place a single-family home in the site within the required setbacks, however the home would have to be carefully designed for the. lot. The developers are aware of this concern, and when the surveying for this subdivision is done for the Administrative and Final Plats, there may be a slight readjustment of the lot to provide additional " buildable area. 2 Public Utilities Water: A six-inch water main will be extended along Canterbury Court from Minnesota Avenue to serve these seven (7) lots. Sanitary Sewer: An eight-inch sanitary sewer line will be extended along the southeast property line of Lot 3 into Canterbury Court from an existing eight-inch sanitary sewer that runs through the northern portions of proposed Lots 1, 2, and 3, and the northeast side of Lots 3 and 4. Storm Sewer: A storm sewer connection for the sump lines for each of the lots is proposed in an easement along the northwest side of Lot 4. This sewer will drain into the drainage channel that is located along the north side of this proposed development. The existing drainage channel that abuts and passes through this property is experiencing some degradation. Because of this condi- tion, a check dam or drop structure is needed for bank stabilization. This work will be done by the City to improve the drainage condition in the area. Electric: Electric power is available to each lot. Streets and Vehicular Access: Canterbury Court, a cul-de-sac, is pro- posed as the primary access for the seven (7) lots in the addition. Canterbury Court comes off of Minnesota Avenue, which is a north-south street extending between Kingman Road and Ontario Avenue. A temporary bridge has been constructed over the Chicago and North Western Railroad tracks to provide access to Ontario Avenue. The primary access to the Orchard Estates development is via Scholl Road across the railroad tracks, a quarter of a mile to the west. The Minnesota Avenue bridge will be removed and replaced by another north-south crossing of the railroad tracks in the future through a mutual agreement between the City and the railroad. The future location of that crossing has not been determined at this time. However, the Minnesota Avenue access will not be removed until another railroad crossing is developed. Therefore, the developers are only being required to pave Minnesota Avenue to the south side of Canterbury Court and not to the bridge. At the Planning and Zoning Commission meeting of January 3, 1990, a concern was expressed by numerous neighboring property owners regard- ing the safety of the bridge on Minnesota Avenue over the railroad tracks. Specifically, these neighbors were concerned about the increased traffic that would be generated because of the subdivision and the speed of motorists over the bridge. The original intent of this bridge was to provide temporary emergency access only for emergency vehicles to the Kingman-Amherst area and to the Applied Science Center area, during the time when the Scholl Road at-grade crossing is blocked by a train. Minnesota Avenue was never intended to be used for residential and commercial movement into and out of the area north of the Chicago and North Western Railroad tracks. 3 However, a recent 24-hour traffic count taken 20 feet south of the Minne- sota bridge indicates there were 622 vehicles using the Minnesota bridge. This traffic count implies that the residents of Orchard Estates and some employees of the Applied Science Center are using Minnesota Avenue. as a primary access to the area. The projected traffic volumes for Orchard Estates Fourth Addition would be approximately 70 vehicle movements which would be an 11% increase in traffic across the bridge, if Minnesota Avenue were used exclusively. It should be noted that no accidents have been reported on Minnesota Avenue for five years, 1984-1988. A study to determine the location for a permanent crossing of the Chicago and North Western Railroad in the Scholl Road area is scheduled for the 1991-1992 Fiscal Year in the City of Ames Capital Improvement Plan. However, no determination has been made, if or when, a new crossing will be built. City staff has evaluated five alternatives for addressing the safety and traffic concerns at the Minnesota Avenue bridge which include: limited sight distance, narrowness of the bridge which makes two-way movement difficult, frequent use of the bridge by residents and employees in the area for accessing the area north of the railroad tracks, and the use of the bridge as a school route with no separated walkway. The five alterna- tives are listed below with comments concerning how each addresses the problem. 1. Do nothing. This would be a continuation of the situation as it currently exists with the added traffic for Orchard Estates Fourth Addition. 2. Remove the bridge. This alternative would eliminate all the traffic and safety concerns, however, there would be no emergency access available if the Scholl Road crossing is blocked. 3. Make Minnesota Avenue one-way_going north with no left turn on Kingman Road. This alternative would address the concern about the narrowness of the bridge and limited sight distance and would allow for separation of pedestrian movement. However, the use of a one-way street could prove confusing to the motorist and is inappropriate when a one-way pair of streets cannot be provided. 4. Allow only emergency access across the bridge by means of a gate. This alternative addresses the traffic concern as well as safety considerations due to sight distance problems and the narrow bridge width, which makes two vehicles passing each other difficult. It also addresses the safety of school children since there would not be traffic on the bridge. 5. Install pretimed, traffic control lights to allow alternate, single direction access and provide a separated pedestrian walkway for school children. This alternative improves the safety of school children and addresses the sight distance concerns, and the narrowness of the bridge since traffic movement would be 4 alternate one-way. In addition, the use of the traffic control devices should discourage frequent traffic movement along Minnesota Avenue since there will be short delays for alternate single direction movement. [Note: the traffic control lights would be similar to the lights used on Haber Road where the road narrows to one-way under the overpass. ] Emergency vehicles would be able to override the system through the use of warning devices. The City staff believes Alternative #5 is the best approach to the problem. This alternative addresses the safety concerns involving separation of pedestrian movement for school children, provides for single direction access which takes care of the sight distance and narrow pavement width concerns and the traffic control device serves to discourage the use of Minnesota Avenue as a primary access to the residential area north of the railroad tracks. The developer has agreed to pay for the traffic control devices and the extension of a sidewalk along the west side of Lot 7 in Orchard Estates Fourth Addition which will be channelized to the pedestri- an walkway across the bridge. The City will create a separated walkway across the bridge as a part of this project. Parkin The developers are proposing a three car parking island in the end of the cul-de-sac. Staff has some serious concerns about this type of parking island. A major concern is maintenance of this type of island. Curb edges could easily be damaged by snow plowing equipment and vehicles using the street. In addition, there are liability concerns since the City would be responsible for this parking area. Aesthetics also enter into the objection to this type of development. When looking down Canterbury Court, one would see three cars parked in the middle of the cul-de-sac. Staff believes streets should be used for traffic movement and not for the storage of vehicles, particularly in the middle of the street. This parking area also appears to be unnecessary because there should be adequate room on private property to park additional vehicles. At the Planning and Zoning Commission meeting of January 17, 1990, this item was reviewed again and the Commission recommended that the CDP for Orchard Estates be approved with the following stipulations: a. That the parking area be removed from the island in the cul-de-sac and the island size be reduced to a 15 foot radius; b. That developer pay for traffic control devices for alternate, single direction access across .the bridge; and C. That the developer extend a sidewalk along the west side of Lot 7 which will be channelized to the four (4) foot wide pedestrian walkway across the bridge which will be developed by the City. ALTERNATIVES 1. The City Council can approve the CDP for Orchard Estates Fourth Addition as submitted. a. 2. The City Council can approve the CDP for Orchard Estates Fourth Addition with the stipulations as recommended by the Planning and Zoning Commission. 3. The City Council can deny approval of the CDP for Orchard Estates Fourth Addition. 4. The City Council can table this request for additional information from City staff or the developer. MANAGER'S RECOMMENDED ACTION: It is the recommendation of the City Manager that the City Council adopt Alternative #2. This will approve of the CDP for Orchard Estates with the stipulations that: a. That the parking area be removed from the island in the cul-de-sac and the island size be reduced to a 15 foot radius; b. That developer pay for traffic control devices for alternate, single direction access across the bridge; and C. That the developer extend a sidewalk along the west side of Lot 7 which will be channelized to the four (4) foot wide pedestrian walkway across the bridge which will be developed by the City. COUNCIL ACTION: y\bpo\caf\orchard.213