Loading...
HomeMy WebLinkAboutA013 - Letter dated December 12, 1978 certifying completion of sanitary sewer, water main, and storm sewer construction F1 LED A CITY CL LRK CITY OF Ati.ES,IOliVA December 12, 1978 DEC 12 1978 Honorable Mayor and Council Members City of Ames , Iowa 50010 Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, and storm sewer construction on Cochrane Boulevard, Michelle Drive, Marjo Drive, Park Road, Cochrane Circle and Marjo Circle in Oakwood First Addition to the City of Ames , Iowa have been completed in an acceptable manner in accordance with the plans and specifications of the City of Ames, Iowa and inspected by the Engineering Department of the City of Ames , Iowa. I further certify that the quantities of the completed work are as follows : Sanitary Sewer Item Description Unit Quantity 1 . 8" vitrified clay pipe l .f. 2,778 2. Standard manhole ea. 14 Water Main Item Description Unit Quantity 3: 6" D. I.P. main l .f. 2,577 4. 611x6"x6" tee ea. 4 5. 6" tapping valve & sleeve ea. 1 6. 6" gate valve and box ea. 8 7. 8" D. I.P. main l .f. 1 ,005 8. 811x6"x8" tee ea. 3 9. 8" tapping valve & sleeve ea. 1 10. 8" gate valve and box ea. 2 11 . 6" bends ea. 11 12. 8" bends ea. 2 13. Hydrants set ea. 11 14. Reaction blocks ea. 22 15. Wall pipe reaction block ea. 4 LUMP SUM TOTAL FOR SANITARY SEWER & WATER MAIN $ 81 ,000.00 c Storm Sewer Unit Item Description Quantity Unit Price Amount 16. 15" R.C.P. 1 ,060 l .f. $ 13.75 $ 14,575.00 17. 18" R.C.P. 274 l .f. 15.00 4,110.00 18. 21" R.C.P. 546 l .f. 17.25 9,418.50 19. 24" R.C.P. 94 l .f. 24.50 2,303.00 20. 27" R.C.P. 8 l .f. 24.50 196.00 21 . Intakes 16 ea. 650.00 10,400.00 22. Standard manholes 7 ea. 700.00 4,900.00 23. 15" F-.E.S. 4 ea. 125.00 500.00 TOTAL STORM SEWER $ 46,402.50 GRAND TOTAL $127,402.50 Very truly yours , Chant and, P. -E. Public Works Director APPROVED BY: T. V. Spren 1 , City Manager AOC:sh cc: Mr. Ev Cochrane D. C. Construction Co. , Finance Dept.