HomeMy WebLinkAboutA013 - Letter dated December 12, 1978 certifying completion of sanitary sewer, water main, and storm sewer construction F1 LED
A CITY CL LRK
CITY OF Ati.ES,IOliVA
December 12, 1978 DEC 12 1978
Honorable Mayor and Council Members
City of Ames , Iowa 50010
Ladies and Gentlemen:
I hereby certify that the sanitary sewer, water main, and storm sewer construction
on Cochrane Boulevard, Michelle Drive, Marjo Drive, Park Road, Cochrane Circle and Marjo
Circle in Oakwood First Addition to the City of Ames , Iowa have been completed in an
acceptable manner in accordance with the plans and specifications of the City of Ames,
Iowa and inspected by the Engineering Department of the City of Ames , Iowa.
I further certify that the quantities of the completed work are as follows :
Sanitary Sewer
Item Description Unit Quantity
1 . 8" vitrified clay pipe l .f. 2,778
2. Standard manhole ea. 14
Water Main
Item Description Unit Quantity
3: 6" D. I.P. main l .f. 2,577
4. 611x6"x6" tee ea. 4
5. 6" tapping valve & sleeve ea. 1
6. 6" gate valve and box ea. 8
7. 8" D. I.P. main l .f. 1 ,005
8. 811x6"x8" tee ea. 3
9. 8" tapping valve & sleeve ea. 1
10. 8" gate valve and box ea. 2
11 . 6" bends ea. 11
12. 8" bends ea. 2
13. Hydrants set ea. 11
14. Reaction blocks ea. 22
15. Wall pipe reaction block ea. 4
LUMP SUM TOTAL FOR SANITARY SEWER & WATER MAIN $ 81 ,000.00
c
Storm Sewer
Unit
Item Description Quantity Unit Price Amount
16. 15" R.C.P. 1 ,060 l .f. $ 13.75 $ 14,575.00
17. 18" R.C.P. 274 l .f. 15.00 4,110.00
18. 21" R.C.P. 546 l .f. 17.25 9,418.50
19. 24" R.C.P. 94 l .f. 24.50 2,303.00
20. 27" R.C.P. 8 l .f. 24.50 196.00
21 . Intakes 16 ea. 650.00 10,400.00
22. Standard manholes 7 ea. 700.00 4,900.00
23. 15" F-.E.S. 4 ea. 125.00 500.00
TOTAL STORM SEWER $ 46,402.50
GRAND TOTAL $127,402.50
Very truly yours ,
Chant and, P. -E.
Public Works Director
APPROVED BY:
T. V. Spren 1 , City Manager
AOC:sh
cc: Mr. Ev Cochrane
D. C. Construction Co. ,
Finance Dept.