HomeMy WebLinkAboutA020 - Letter dated December 5, 1984 certifying completion of storm sewer and street construction ,s
U
December 5, 1984
Honorable Mayor and Council Members
City of Ames
Ames, IA. 50010
Ladies and Gentlemen:
I hereby certify that the storm sewer and street construction on Wheeler
Street and Grand Avenue for the Northwood Plaza Subdivision has been com-
pleted in an acceptable manner by D.C. Construction of Ames, Iowa; Stenberg
Concrete Construction, Ames; and ConStruct Inc. , of Ames, Iowa in accor-
dance with the plans and specifications and has been inspected by the Engi-
neering Division of the Public Works Department of the City of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
Unit
Item Description Quantity Unit Price Amount
Storm Sewer
1. 12 " R.C.P. ill l.f. $ 18.00 $ 1,998.00
2. Type "E" intake 1 ea. 900.00 900.00
3. Type "D" intake 2 ea. 900.00 1,800.00
Total Storm Sewer $ 4,698.00
Paving - Wheeler Street
1. Strip and stockpile topsoil 389 C.Y. 1.20 466.80
2. Cut and fill 134 C.Y. 1.70 227.80
3. Cut and stockpile fill 1,352 C.Y. 1.40 1,892.80
4. Subgrade preparation 2,441 S.Y. 1.30 3,173.30
5. 7" PCC paving/integral
curb 2,430 S.Y. 17.09 41,528.70
6. Backfill curbs 1,168 l.f. 1.25 1,460.00
7 . Adjust manholes, intakes
& water valve 5 ea. 50.00 250.00
8. Road rock 44.1 tons 14.50 639.45
9. Saw and remove concrete
(includes traffic control) 126 l.f. 7.20 907.20
Paving-Wheeler St. Total $ 50,546.05
Mayor and Council Members
December 5, 1984
Page Two
Unit
Item Description Quantity Unit Price Amount
Paving - Grand Avenue Turn Lane
1. 10" PCC paving/integral
338 S.Y. 22.67 7,662.46
curb
2. Saw and remove concrete 368 l.f. 6.06 2,230.08
3. Excavation and subgrade
lump sum 870.00 870.00
preparation
4. Backfill curbs lump sum 570.00 570.00
5. Remove street light base 2 ea. 50.00 100.00
6. Install dowel bars lump sum 1,085.00 1,085.00
Paving-Grand Avenue Turn Lane $12,517.54
Grand Total $ 67,761.59
wi/nerely,
A.O. Chantland, P.E.
Public Works Director
Approved by:
Steven L. Schainker, City Manager
AOC/dj
cc: City Manager, City Clerk, Finance, Public Works, Paul Hinderaker, D.C.
Construction, Stenberg Concrete, and Construct, Inc.