Loading...
HomeMy WebLinkAboutA016 - Letter dated September 5, 1984 certifying completion of sanitary sewer, water main, storm sewer, and street construction September 5, 1984 r Honorable Mayor and Council Members City of Ames Ames, IA. 50010 Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, storm, sewer, and street construction on Wheeler Street and Roy Key Avenue for the Northwood Plaza Subdi- vision has been completed in an acceptable manner by D.C. Construction, Ames; Stenberg Concrete Construction, Ames; ConStruct Inc. , Ames; and Des Moines As- phalt & Paving Co. of Ames, Iowa, in accordance with the plans and specifica- tions and has been inspected by the Engineering Division of the Public Works Department of-the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: Unit Item Description Quantity Unit Price Amount Sanitary Sewer 1. 8" A.B.S 992 l.f. $ 12.60 $12,499.20 2. Standard 48" diameter manhole 5 ea. 1,000.00 5,000.00 3. Tie into existing manhole 1 ea. 10.00 10-00 4. 8" pipe plug (2 are in manholes) 3 ea. 15.00 45.00 5. Crushed rock embedment 205.15 tons 12.00 2,461.80 Total Sanitary Sewer $ 20,016.00 Water Main 1_: 6" DIP (hydrant runs) 24 l.f. $ 15.00 $ 360.00 2. 6" DIP or PVC 20 l.f. 9.00 180.00 3. 8" DIP or PVC 1,362 l.f. 10.00 13,620.00 4, 12"xl2"x8" tapping tee valve and sleeve 1 ea. 1,450.00 1,450.00 5. 8" M.J. gate valve and box 3 ea. 400.00 1,200.00 6. 6" M.J. gate valve and box 1 ea. 300.00 300.00 7 . 8" M.J. anchoring tee 1 ea. 220.00 220.00 8. 8"x8"x6" anchoring tee 3 ea. 300.00 900.00 9. Hydrant installation 2 ea. 150.00 300.00 10. 6" x 8" reducer 1 ea. 150.00 150,00 11. 8" M.J. pipe plug 2 ea. 30.00 60.00 b • Northwood Plaza Subdivision September 5, 1984 Page Two Unit Item Description Quantity Unit Price Amount 12. Remove & replace 6" M.J. pipe plug -0- ea. 10.00 -0- 13. Standard reaction blocks 9 ea. 30.00 270.00 14. Crushed rock embedment 14.1 tons 10.00 141.00 Total Water Main $ 19,151.00 Storm Sewer - 1. Tie into existing intake 1 ea. $ 175.00 $ 175.00 2. 12" R.C.P. 371 l.f. 13.00 4,823.00 3. 15" R.C.P. w/(3 stubs) 97 l.f. 16.00 1,552.00 4 . 16" R.C.P. 110 l.f. 19.00 2,090.00 5. 24" R.C.P. 434 l.f. 24.00 10,416.00 6. 27" R.C.P. 371 l.f. 29.00 10,759.00 7 . Install Type "D" intake 2 ea. 700.00 1,400.00 8. Install Type "E" intake 7 ea. 700.00 4,900.00 9. Install Type RA-8 Intake 2 ea. 2,200.00 4,400.00 10. Crushed rock embedment 82.25 tons 12.00 987.00 Total Storm Sewer $ 41,502.00 Streets (Wheeler 107+19 to 113+77, Roy Key 6+67 to 10+74) 1, Subgrade preparation for paving 3,500 S.Y. $ 1.20 $ 4,200.00 2. 7" PCC pavement 1,423 S.Y. 16.38 23,308.74 3. 30" PCC curb & gutter 1,115 l.f. 7.60 8,474.00 4. Asphalt base 5h" 465 ton 26.20 12,183.00 5. Asphalt Mat - 1h" 165 ton 27.40 4,521.00 6 . Tack coat 319.1 gal. 1.20 382.92 7 . Backfill curbs & shape to property line 1,970 l.f. 1.25 2,462.50 8 . Adjust manholes and intakes 10 ea. 50.00 500.00 Total Streets $ 56,032.16 Grand Total $ 136,701.16 SencAntland, P.E. Public Works Director Approved by: v Steven L. Schainker, City Manager cc: City Manager, City Clerk, Contractors, Finance, Public Works