Loading...
HomeMy WebLinkAbout~Master - Change Order for Grand Avenue Extension Location and Environmental Studies RESOLUTION NO. 15-367 RESOLUTION APPROVING CHANGE ORDER TO ENGINEERING SERVICES AGREEMENT FOR GRAND AVENUE EXTENSION LOCATION AND ENVIRONMENTAL STUDIES FOR THE CITY OF AMES,IOWA WHEREAS,In preparation for a future project to extend Grand Avenue from Squaw Creek Drive to South 16' Street and the realignment and extension of South 5th Street between South Duff Avenue and Grand Avenue, location and environmental studies must first be performed for this corridor, prior to transitioning into the sequential phases of project development outlined in the current Capital Improvements Plan(CIP); and, WHEREAS, the study area for this project consists of the extension of Grand Avenue and two intersection improvement areas, including South 5th Street/South Duff Avenue and at South 16th Street and South Duff Avenue; and, WHEREAS, the location and environmental studies scope focuses on the completion of services and deliverables to provide project management assistance,development of a location study, and necessary National Environmental Policy Act(NEPA) documentation; and, WHEREAS,a professional services agreement(PSA)for Grand Avenue Extension Location and Environmental Studies was executed for Phase 1 between the City of Ames and Howard R. Green of Johnston,Iowa,on August 26,2014,with the Iowa Department of Transportation(IDOT) giving concurrence on September 2, 2014, in an amount not to exceed $315,150.23; and, WHEREAS, due to the time line of this project and budgeting constraints for the Grand Avenue Extension,both phases could not be funded when the original contract was signed; and, WHEREAS, since that time, funding has been distributed over two fiscal years in the CIP to cover both of the needed phases; therefore, it is now possible with this change order to proceed through the completion of the NEPA process; and, WHEREAS,the project study area includes a large portion of the floodway and fringe areas, which has led to a goal to construct the proposed bridge and roadway at an elevation to prevent overtopping during high-water events; and, WHEREAS,therefore,the project scope is complex and will be completed over the course of a 24-month period, which began in August 2014 and has an anticipated completion in August 2016; and, WHEREAS, Phase 1 of this project is funded by $300,000 in General Obligation (G.O.) Bonds and$103,806 in Federal Demonstration Funds that are included in the 2013/14 CIP; and, WHEREAS,Phase 2 of this project is funded by$280,000 in G.O.Bonds in the 2015/16 CIP, bringing total available funding to approximately$683,806; and, WHEREAS, the change order is to increase the purchase order currently in place with Howard R. Green by$265,861.35 for Phase 2 of this project, with the current funding showing to be authorized in the 2015/16 CIP. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the Change Order to the Engineering Services Agreement with Howard R. Green, Inc., of Johnston,Iowa,in an amount not to exceed$265,861.35 for the Grand Avenue Extension-Location and Environmental Studies is hereby approved. ADOPTED THIS 9t'day of June, 2015. C-11�"W-1�a& A. Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Nelson Seconded by: Betcher Voting aye: Betcher, Corrieri, Gartin,Nelson, Orazem Voting nay: None Absent: Goodman Resolution declared adopted and signed by the Mayor this 9tn day of June, 2015.