Loading...
HomeMy WebLinkAbout~Master - Completion of Substation Electrical Materials RESOLUTION NO. 15-337 RESOLUTION ACCEPTING COMPLETION OF SUBSTATION ELECTRICAL MATERIALS (BID NO. 1 - 69-KV SWITCHES; BID NO. 2 - INSTRUMENT TRANSFORMERS; BID NO. 4 - STEEL STRUCTURES) FOR THE CITY OF AMES,IOWA WHEREAS,DGR Engineering has filed a certificate of completion for Substation Electrical Materials(Bid No. 1 -69-kV Swithces;Bid No.2-Instrument Transformers; and,Bid No.4-Steel Structures) for the City of Ames, Iowa, in accordance with contracts dated July 23, 2013, by and between the City of Ames,Iowa,and Hamby-Young of Aurora,Ohio,RESCO of Ankeny,Iowa,and Galvanizers, Inc., of West Fargo,North Dakota, respectively. NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of Ames, Iowa, as follows: Section 1. The total contracts for these Substation Electrical Materials have been fully completed by the Contractor in accordance with the terms of the contracts and are hereby accepted and approved. Section 2. The total cost of the contract for: Bid No. 1 (69-kV Switches) is $52,552.84; Bid No. 2 (Instrument Transformers) is $65,779.59; Bid No. 4 (Steel Structures) is $2,189.62. Section 3. The amounts due the aforementioned contractors are hereby ordered paid as provided by law. Section 4. All resolutions or orders or parts thereof in conflict herewith are hereby repealed to the extent of such conflict. ADOPTED THIS 26th day of May, 2015. lij-& A. ter• ��� Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Nelson Seconded by: Corrieri Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 26th day of May, 2015.