HomeMy WebLinkAbout~Master - Completion of Substation Electrical Materials RESOLUTION NO. 15-337
RESOLUTION ACCEPTING COMPLETION OF
SUBSTATION ELECTRICAL MATERIALS (BID NO. 1 - 69-KV SWITCHES; BID
NO. 2 - INSTRUMENT TRANSFORMERS; BID NO. 4 - STEEL STRUCTURES)
FOR THE CITY OF AMES,IOWA
WHEREAS,DGR Engineering has filed a certificate of completion for Substation Electrical
Materials(Bid No. 1 -69-kV Swithces;Bid No.2-Instrument Transformers; and,Bid No.4-Steel
Structures) for the City of Ames, Iowa, in accordance with contracts dated July 23, 2013, by and
between the City of Ames,Iowa,and Hamby-Young of Aurora,Ohio,RESCO of Ankeny,Iowa,and
Galvanizers, Inc., of West Fargo,North Dakota, respectively.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of
Ames, Iowa, as follows:
Section 1. The total contracts for these Substation Electrical Materials have been fully
completed by the Contractor in accordance with the terms of the contracts and are hereby
accepted and approved.
Section 2. The total cost of the contract for:
Bid No. 1 (69-kV Switches) is $52,552.84;
Bid No. 2 (Instrument Transformers) is $65,779.59;
Bid No. 4 (Steel Structures) is $2,189.62.
Section 3. The amounts due the aforementioned contractors are hereby ordered paid as
provided by law.
Section 4. All resolutions or orders or parts thereof in conflict herewith are hereby
repealed to the extent of such conflict.
ADOPTED THIS 26th day of May, 2015.
lij-& A. ter• ���
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Nelson
Seconded by: Corrieri
Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 26th day of May, 2015.