HomeMy WebLinkAbout~Master - Revision to Major Site Development Plan for Old Orchard Mobile Home Park RESOLUTION NO. 15-288
RESOLUTION APPROVING REVISED MAJOR SITE DEVELOPMENT PLAN FOR
OLD ORCHARD MANUFACTURED HOME PARK
FOR THE CITY OF AMES,IOWA
WHEREAS,Grand Center,Ltd.,is proposing to construct a maintenance building within its
Old Orchard Manufactured Home Park; and,
WHEREAS,Old Orchard Manufactured Home Park is in the 1100 block of South 16`'Street
across from the City's Greenbriar Park and east of the ISU College of Veterinary Medicine; and,
WHEREAS, the maintenance building will be constructed at 97 Peach Lane near the
southwest corner of the site; and,
WHEREAS, the proposed plan includes the one-story 1,280 square-foot maintenance
building located in conformance with the setback requirements; and,
WHEREAS, the building will have two garage doors on the south, and it is proposed to be
accessed via an existing non-conforming gravel driveway from an existing gravel road to the west;
and,
WHEREAS, staff has reviewed the criteria and standards the RLP zoning district and of
Section 29.1502(4)(d) and finds the proposal does not change the compliance of the Old Orchard
Major Site Development Plan,with the exception of the proposed use of the current gravel driveway
paving; and,
WHEREAS, Zoning Ordinance Section 29.406 (11) requires that all vehicle areas be hard
surfaced, and the applicant has provided photographs documenting that the existing drive served a
house that was on that site before this standard was enacted; and,
WHEREAS, staff concurs that the driveway is legally non-conforming, however, Zoning
Ordinance Section 29.307(5)describes lower order non-conformities of site improvements such as
landscaping, paving,parking, etc and states this policy for removal of nonconformities; and,
WHEREAS, the applicant has submitted a letter from the project engineer stating that it is
impractical to pave the driveway because it abuts an unpaved street; and,
WHEREAS, City staff has analyzed the applicant's request, reviewed the supporting
material, and conducted an on-site inspection, and staff believes it is practical to end the non-
conformity and to pave the existing driveway at this time with the development of the site, leading
to a gravel roadway does not inhibit paving on site; and,
WHEREAS, at its meeting on April 15, 2015,the Planning and Zoning Commission voted
unanimously to recommend approval without conditions to pave the driveway.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the revision to the Major Site Development Plan for Old Orchard Manufactured Home Park to
add a maintenance building without conditions is hereby approved.
ADOPTED THIS 12th day of May, 2015.
Awo cy/
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Gartin
Seconded by: Betcher
Voting aye: Betcher, Gartin, Goodman,Nelson, Orazem
Voting nay: Corrieri Absent: None
Resolution declared adopted and signed by the Mayor this 12t" day of May, 2015.