RESOLUTION APPROVING REQUEST TO MAKE JOINT APPLICATION FOR
SPECIAL USE PERMIT TO DEVELOP CELLULAR INSTALLATION
ON CITY PROPERTY
FOR THE CITY OF AMES,IOWA
WHEREAS, several cellular providers have contracts to place private cellular network
equipment on City property; and,
WHEREAS,earlier this year,City staffwas approachedby SSD,the development subsidiary
of Selective Site Consultants,Inc.(SSC),with a proposal to place a cellular antenna on City property
located just west of the Ames Dog Park in southeast Ames; and,
WHEREAS,SSC is representing Verizon Wireless as a site acquisition consultant,and it has
proposed developing a monopole antenna approximately 120-130 feet in height west of the Dog
Park; and,
WHEREAS, SSC would own the pole and its first tenant would be Verizon,with additional
tenants that could be accommodated in the future; and,
WHEREAS,the following steps must occur prior to construction of an antenna: 1)SSC must
complete a site evaluation to develop its design proposal;2) SSC must enter into a lease agreement
with the City to use the property; and, 3) SSC must obtain a Special Use Permit from the City's
Zoning Board of Adjustment; and,
WHEREAS,the lease document between the City and SSC will describe the specific site area
that SSC has rights to use,however,if SSC is unable to obtain a Special Use Permit or finds that the
precise site is unsuitable for construction, the lease would need to be amended, which would take
additional time; and,
WHEREAS,in order to avoid that scenario, SSC is requesting authorization to snake a joint
application with the City for a Special Use Permit and to conduct its site analysis prior to entering
into a long-term lease with the City; and,
WHEREAS, according to the City's Zoning Code, SSC must obtain a Special Use Permit
from the Zoning Board of Adjustment(ZBA)prior to constructing its antenna; and,
WHEREAS,in granting this permit,the ZBA may place certain conditions on the orientation,
location, dimensions, and other aspects of the antenna installation; and,
WHEREAS, SSC has requested permission to make a joint application for a Special Use
Permit prior to the completion of a long-term lease agreement with the City,and since the City owns
the property on which SSC would like to place an antenna,the City Council must agree to list the
City as the property owner on the Special Use Permit application; and,
WHEREAS, obtaining a Special Use Permit at this time does not grant SSC the right to
construct its antenna, and SSC will still be required to receive property rights through a lease
agreement with the City.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the request from Selective Site Consultants to make a joint application with the City of Ames
for a Special Use Permit to develop a cellular installation on City property is hereby approved.
ADOPTED THIS 28th day of April, 2015.
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Goodman
Seconded by: Corrieri
Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 28th day of April, 2015.