HomeMy WebLinkAboutA010 - Letter to Mayor and Council dated December 16, 1992, certifying completion of sanitary sewer, water main, storm sewer and street paving bcmd 15 Il AAE 11 CITY OF AMES , iowA .0010 Public Works Department 515 Clark 515-239-5160 December 16, 1992 Honorable Mayor and Council Members City of Ames DEC 1 7 eCa,P19i; Ames, Iowa 50010 CITY GIEHK CITY OF AMES,IOWA Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, storm sewer, and street paving in Northridge Subdivision, 9th Addition has been completed in an acceptable manner by Van Hauen and Associates, Construct Inc. , and Manatt's Inc. and has been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT --------------------------------------------------------------------------------- SEE ATTACHMENT PROJECT TOTAL $314,561.70 Sincerely, Paul D. Wiegan P.E. Public Works Director Approved by: T. Robert Kindred, Assistant City Manager PDW/kg cc: City Clerk, Finance, Contractor, PW Adm. Asst. , PW Const. Supr. AMES — THE CENTER OF IT ALL ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT ---------------------------------------------------------------------------------- SANITARY SEWER 1 Manholes Ea. 1,800.00 10.0 18,000.00 2 8" sewer pipe l.f. 28.00 1,833.0 51,324.00 3 15" sewer pipe l.f. 45 206.0 9,270.00 TOTAL SANITARY: 78,594.00 WATER MAIN 1 6" water pipe l.f. 14.00 205.0 2,870.00 2 8" water pipe l.f. 16.00 2,047.0 32,752.00 3 8" gate valve & box Ea. 500.00 6.0 3,000.00 4 Install hydrant run Ea. 300.00 5.0 1,500.00 TOTAL WATER: 40,122.00 STORM SEWER 1 12" R.C.P. l.f. 20.00 247.0 4,940.00 2 15" R.C.P. l.f. 20.00 671.0 13,420.00 3 18" R.C.P. l.f. 20.00 200.0 4,000.00 4 21" R.C.P. l.f. 28.00 398.0 11,144.00 5 24" R.C.P. l.f. 30.00 789.0 23,670.00 6 48" R.C.P. l.f. 95.00 159.0 15,105.00 7 Open throat intake ea. 900.00 18.0 16,200.00 8 Manholes, 48" dia. ea. 1000.00 2.0 2,000.00 9 8" beehive intake ea. 500.00 1.0 500.00 10 Manhole, 72" dia. ea. 2500.00 1.0 2,500.00 93,479.00 STREET PAVING 1 Subgrade preparation s.y. 1.10 7,392.0 8,131.20 2 Concrete curb and gutter l.f. 8.35 3,965.0 33,107.75 3 Asphalt base, 6-j" depth ton 27.40 2,012.15 55,132.91 4 Asphalt base, 9" depth ton 27.40 218.79 5,994.84 TOTAL STREET: 102,366.70 GRAND TOTAL: $314,561.70