Loading...
HomeMy WebLinkAboutA015 - Letter to Mayor and Council dated January 6, 1994, certifying completion of sanitary sewer, water main storm sewer and steet paving A40 4 CITY OF AMES Ati'ES 1aw,4 CITY OF AME P.O.BOX 811 AMES IOWA 50010 Community-University-Opportunity Public Works Dept. 515-239-5160 January 6, 1994 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the sanitary sewer, watermain, storm sewer, and street paving in Northridge Parkway Subdivision, 4th, 5th, 6th, 7th, 8th, and loth Additions have been completed in an acceptable manner by Van Hauen & Associates and Manatt's Inc. and has been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: SEE ATTACHMENT Project Total $278,978.18 Sincerely, D. ("I � Paul D.Wiegand,P.E. Public Works Director Approved by. : T. Robert Kindred, Assistant City Manager PDW/kg c: City Clerk, Finance, Contractor, PW Admin.Asst. , Construction Supervisor r^ Item Description Unit Price Quantity y Total 4TH ADDITION 1 Asphalt surface S.Y. 2.35 1055.0 2,479.25 5TH & 6TH ADDITIONS 2 Asphalt surface S.Y. 2.35 4800.0 11,280.00 7TH & 8TH ADDITIONS 3 Asphalt surface S.Y. 2.26 3095.0 6,994.70 LOTH ADDITION 4 Manholes ea. 1,300.00 7.0 9,100.00 5 8" PVC truss pipe l.f. 33.00 1448.0 47,784.00 6 8" PVC SDR-18 l.f. 20.00 2047.0 40,940.00 7 6" Ductile iron hydrant runs l.f. 20.00 51.0 1,020.00 8 8" bends @ 45° ea. 125.00 3.0 375.00 9 8" bends @ 22Z° ea. 125.00 1.0 125.00 10 8" bends @ 11--` ea. 125.00 1.0 125.00 11 Tee's 8" x 8" x 6" ea. 125.00 4.0 500.00 12 Tee's 8" x 8" x 8" ea. 100.00 2.0 200.00 13 8" Cross ea. 150.00 1.0 150.00 14 8" Valves ea. 300.00 8.0 2,400.00 15 16" Casing l.f. 100.00 66.0 6,600.00 16 12" RCP 1.f. 20.00 462.0 9,240.00 17 18" RCP l.f. 20.00 781.0 15,620.00 18 21" RCP l.f. 30.00 114.0 3,420.00 19 Open throat intakes ea. 900.00 11.0 9,900.00 20 Storm manhole ea. 1,200.00 1.0 1,200.00 21 Subgrade preparation S.Y. 1.10 8390.0 9,229.00 22 30" PCC curb and gutter l.f. 8.35 4524.0 37,775.40 23 Asphalt base ton 27.90 2240.9 62,520.83 -------------- -------------- Project Total $278,978.18 --------------