Loading...
HomeMy WebLinkAboutA006 - Letter to Mayor and Council dated February 11, 1991, certifying completion of utility construction Iiil� C IT- Y O F AM E-S- , I OWA 50010 _ II Public Works Department AL L-A AERIC.A CITY 515 Clark 1982-1983 515-239-5160 FebrXMrq 11 FILED Honorable Mayor and Council Members FEB 2 71991 City of Ames ; Ames, Iowa 50010 CITY CLERK CITY OF AMPS, ►OWA Ladies and Gentlemen: I hereby certify that the 1990 Utility Construction in Northridge Parkway Subdivision has been completed in an acceptable manner by Ames Trenching Inc. , Con-Struct Inc. and Manatt's Inc. , all of Ames, Iowa and has been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT --------------------------------------------------------------------------------- SEE ATTACHMENT Sincerely, Paul D. Wieganfl,P.E. Public Works Director Approv d by: T. Robert Kindred, Assistant City Manager PDW/kg cc: City Clerk, Finance, Contractor, Public Works Admin. Asst. , Public Works, and Construction Supervisor AMES — THE CENTER OF IT ALL f � � a 1990 Utility Construction in Northridge Parkway Subdivision ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT ---------------------------------------------------------------------------------- 1ST ADDITION - STREETS 1 Asphalt Surface S.Y. 2. 15 10614.0 22,820. 10 ------------ $22,820. 10 2ND ADDITION - SANITARY 1 Manholes EA. 1,800.00 1.0 1,800.00 2 8" P.V.C. Truss Pipe L.F. 27.50 209.0 5,747.50 ------------ $7,547.50 2ND ADDITION - WATER 1 6" P.V.C. Pipe L.F. 16.50 172.0 2,838.00 2 Hydrant Installation EA. 150.00 1.0 150.00 ------------ 52,988.00 2ND ADDITION - STREET 1 Curb & Gutter L.F. 7.70 4128.0 31,785.60 2 5A" A.C.C. Base S.Y. 7.95 4259.0 33,859.05 3 712" A.C.C. Base S.Y. 10.99 2129.0 23,397.71 ------------ $89,042.36 3RD ADDITION - SANITARY 1 Manholes EA. 1800.00 3.0 5,400.00 2 8" P.V.C. Truss Pipe L.F. 25.00 865.0 21,625.00 ------------ $27,025.00 3RD ADDITION - WATER 1 6" P.V.C. Pipe L.F. 15.00 1969.0 29,535.00 2 6" DI.P. Pipe L.F. 15.00 38.0 570.00 3 6" 22�'!° Bends EA. 280.00 2.0 560.00 4 6" 1140 Bends EA. 280.00 2.0 560.00 5 6" x 6" x 6" Tees EA. 280.00 4.0 1,120.00 6 6" Cross EA. 400.00 2.0 800.00 7 6" Gate Valve & Box EA. 580.00 6.0 3,480.00 8 Hydrant Installation EA. 150.00 6.0 1,050.00 ------------ 537,675.00 3RD ADDITION - STORM 1 12" R.C.P. L.F. 15.00 465 6,975.00 Manholes EA. 1800.00 ] 1 ,800.00 3 Intakes, Open Throat EA. 950.00 6 5.700.00 ------------ $14,475.00 3RD ADDITION - STREETS 1 Curb & Gutter L.F. 7.70 701 5 ,397.70 2 Asphalt Base S.Y. 7.95 937 7,449. 15 ------------ $12,846.85 Grand Total: $214,419.81