HomeMy WebLinkAboutA006 - Letter to Mayor and Council dated February 11, 1991, certifying completion of utility construction Iiil� C IT- Y O F AM E-S- , I OWA 50010
_ II
Public Works Department
AL L-A AERIC.A CITY 515 Clark
1982-1983 515-239-5160
FebrXMrq 11
FILED
Honorable Mayor and Council Members FEB 2 71991
City of Ames ;
Ames, Iowa 50010 CITY CLERK
CITY OF AMPS, ►OWA
Ladies and Gentlemen:
I hereby certify that the 1990 Utility Construction in Northridge Parkway
Subdivision has been completed in an acceptable manner by Ames Trenching Inc. ,
Con-Struct Inc. and Manatt's Inc. , all of Ames, Iowa and has been inspected by the
Engineering Division of the Public Works Department of the City of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
---------------------------------------------------------------------------------
SEE ATTACHMENT
Sincerely,
Paul D. Wieganfl,P.E.
Public Works Director
Approv d by:
T. Robert Kindred, Assistant City Manager
PDW/kg
cc: City Clerk, Finance, Contractor, Public Works Admin. Asst. , Public Works, and
Construction Supervisor
AMES — THE CENTER OF IT ALL
f �
� a
1990 Utility Construction in Northridge Parkway Subdivision
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
----------------------------------------------------------------------------------
1ST ADDITION - STREETS
1 Asphalt Surface S.Y. 2. 15 10614.0 22,820. 10
------------
$22,820. 10
2ND ADDITION - SANITARY
1 Manholes EA. 1,800.00 1.0 1,800.00
2 8" P.V.C. Truss Pipe L.F. 27.50 209.0 5,747.50
------------
$7,547.50
2ND ADDITION - WATER
1 6" P.V.C. Pipe L.F. 16.50 172.0 2,838.00
2 Hydrant Installation EA. 150.00 1.0 150.00
------------
52,988.00
2ND ADDITION - STREET
1 Curb & Gutter L.F. 7.70 4128.0 31,785.60
2 5A" A.C.C. Base S.Y. 7.95 4259.0 33,859.05
3 712" A.C.C. Base S.Y. 10.99 2129.0 23,397.71
------------
$89,042.36
3RD ADDITION - SANITARY
1 Manholes EA. 1800.00 3.0 5,400.00
2 8" P.V.C. Truss Pipe L.F. 25.00 865.0 21,625.00
------------
$27,025.00
3RD ADDITION - WATER
1 6" P.V.C. Pipe L.F. 15.00 1969.0 29,535.00
2 6" DI.P. Pipe L.F. 15.00 38.0 570.00
3 6" 22�'!° Bends EA. 280.00 2.0 560.00
4 6" 1140 Bends EA. 280.00 2.0 560.00
5 6" x 6" x 6" Tees EA. 280.00 4.0 1,120.00
6 6" Cross EA. 400.00 2.0 800.00
7 6" Gate Valve & Box EA. 580.00 6.0 3,480.00
8 Hydrant Installation EA. 150.00 6.0 1,050.00
------------
537,675.00
3RD ADDITION - STORM
1 12" R.C.P. L.F. 15.00 465 6,975.00
Manholes EA. 1800.00 ] 1 ,800.00
3 Intakes, Open Throat EA. 950.00 6 5.700.00
------------
$14,475.00
3RD ADDITION - STREETS
1 Curb & Gutter L.F. 7.70 701 5 ,397.70
2 Asphalt Base S.Y. 7.95 937 7,449. 15
------------
$12,846.85
Grand Total: $214,419.81