HomeMy WebLinkAboutA010 - Letter to Mayor and Council dated November 30, 1989 certifying completion of sanitary sewer, water main, storm sewer, street base and bike path base Ii i � CITY OF AMES , IOWA 50010 II 125 S. 3rd Street 515-239-5160 November 30, 1989 Honorable Mayor and Council Members City of Ames Ames Iowa 50010 Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, storm sewer, street base, and bike path base all in the First Addition of Northridge Parkway Subdivision have been completed in an acceptable manner by McAninch Corporation of Des Moines, Con-Struct, Inc. of Ames, and Manatts Inc. of Ames and has been inspected by the Engineering Division of the Public Works Department of the City of Ames. I further certify that the quantities of the completed work are as follows: Item Description Quantity Amount Sanitary Sewer Mains 1 Manholes (standard) 16 ea. $ 20,400.00 la Drop manhole 1 ea. 2,560.00 2 15" truss pipe 862.5 1.f. 20,527.50 2a 15" RCP 163 l.f. 7,661.00 2b 8" truss pipe 3,402 1.f. 58,684.50 3 16"x4" casing/boring 70 1.f. 5,180.00 Sanitary Sewer total $115,013.00 Water Main Extension 4 16" D.I.P. 1,683 l.f. 36,268.65 4a 8" P.V.C. 66 I.f. 656.70 4b 6" P.V.C. 2,029 I.f. 15,521.85 4c 24"x 4" boring/casing 64 1.f. 6,144.00 5. 16" 221' bend 1 ea. 410.00 5a 6" 22" bend 2 ea. 170.00 5b 6" 11" bend 4 ea. 340.00 6 16"x16"x8" tee 1 ea. 570.00 6a 16"xl6"x6" tee 2 ea. 1,130.00 6b 8"x81'x6" tee 1 ea. 140.00 AMES — THE CENTER OF IT ALL Northridge Parkway lst Nov. 30, 1989 Page 2 Item Description Quantit Amount 6c 6"x6"x6" tee 9 ea. 1,080.00 6d 16"x6" cross 2 ea. 1,220.00 7 16" butterfly valve & box 5 ea. 6,325.00 7a 8" gate valve & box 1 ea. 375.00 7b 6" gate valve & box 10 ea. 2,850.00 8 Hydrant installation 10 ea. 2,800.00 Water Total $ 76,001.20 Storm Sewer 9 54" R.C.P. 996 l.f. 85,905.00 10 48" R.C.P. 243 l.f. 16,803.45 11 24" R.C.P. 248 l.f. 5,766.00 12 21" R.C.P. 346 l.f. 7,041.10 13 18" R.C.P. 385 l.f. 6,622.00 14 15" R.C.P. 646 l.f. 9,851.50 15 12" R.C.P. 2041 l.f. 27,961.70 15a 8" truss pipe 33 1.f. 330.00 16 54" FES w/curtain wall 1 ea. 985.00 17 Special manhole 4 ea. 9,200.00 17a Open throat intakes 3 ea. 3,045.00 17b RA-8 Intakes 3 ea. 5,400.00 18 Standard manholes 2 ea. 1,500.00 19 Open throat intakes 35 ea. 24,500.00 19a 8" beehive intake 1 ea. 450.00 Storm total $205,360.75 Paving Construction 20 Subgrade preparation 14,004 s.y. 14,004.00 21 30" concrete curb & gutter 6,996 1.f. 53,169.60 22 7"' asphalt base 7,489 s.y. 80,881.20 23 51" asphalt base 3,125 s.y. 24,468.75 Paving total $172,523.55 Northridge Parkway 1st Nov. 30, 1989 Page 3 Item Description Quantity Amount Bikepath Construction 24 3" R.A.P. base 1,529 l.f. 1,941.83 Bikepath total $1,941.83 Grand total $570,840.33 Sincerely, -0 Paul D. Wiegand, VE:" Public Works Director Approved by: Steven L. Schainker, City Manager PDW/dwj cc: City Clerk, Finance, Contractor, Developer, Public Works Admin. Asst. , Public Works, & Construction Supervisor