Loading...
HomeMy WebLinkAboutA022 - Council Action Form dated March 24, 1992 COUNCIL ACTION FORM Item # O/Z Date: March 24, 1992 SUBJECT: Acceptance of a water main extension and fire hydrants across Lots 5, 6, an �7 -1; r�dmarSdirs%om, (Western Hills Apartments at 230 Raphael AN Ln BACKGROUND: By Fire Code, Western Hills Apartments, at 230 Raphael Avenue needed an adequate source of water for fire protection purposes. It was determined that the apartment complex needed a fire hydrant. Looping the main between South Dakota Avenue and Raphael Avenue was, required to get. adequate flow to this hydrant. Privately owned and maintained fire hydrants are not desired since it is questionable whether the hydrant is operational at all times. For this reason, the City prefers that the water main to this hydrant and fire hydrant be under the City's control. The water main and hydrants were installed in a water main easement across Lots 5, 6, and 7 of Landmark Subdivision. VanHauen and Keller Construction Co. Inc. installed the water main and fire hydrants according to City of Ames standard construction specifications. ALTERNATIVES: 1. Accept the water line and fire hydrants for City maintenance as installed by VanHauen & Keller Construction Co. Inc. for Western Hills Apartments. 2. Decline the water line and fire hydrant and let them remain under private control. MANAGER'S RECOMMENDED ACTION: It is recommended by the City Manager that the City Council adopt alter- native number 1, thereby accepting the water line and fire hydrants for City maintenance as installed by VanHauen & Keller Construction Co. Inc. for Western Hills Apartments. COUNCIL ACTION• JB:Orig Mew CITYliII"iiI OF AMES , IOWA 5001 Public Works Department 515 Clark 515-239-5160 March 6, 199.E F6 z Honorable Mayor and Council Members City of Ames 14AR 3 01992 Ames, Iowa 50010 p, CITY OF WES,IO1bA Ladies and Gentlemen: I hereby certify that the Watermain construction in the Western Hills Development has been completed in an acceptable manner by Van Hauen & Keller of Ames and has been inspected by the Engineering Division of the Public Works Department of, the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT --------------------------------------------------------------------------------- 1 8" Waterpipe L.F. 478 2 Tunnel for pipe L.F. 40 3 8" Tee EA. 1 4 Set hydrant & valve EA. 1 5 Tapping valve & sleeve EA. 1 PROJECT TOTAL $21,400.00 Sincerely, Paul D. Wiegand,P.E. Public Works Director Approved by-,) -; T. Robert Kindred, Assistant City Manager . PDW/kg cc: City Clerk, Finance, Contractor, P.W. Admin. Asst. , P.W.Constr. Suprv. AMES — THE CENTER OF IT ALL