HomeMy WebLinkAboutA022 - Council Action Form dated March 24, 1992 COUNCIL ACTION FORM
Item # O/Z
Date: March 24, 1992
SUBJECT: Acceptance of a water main extension and fire hydrants across
Lots 5, 6, an �7 -1; r�dmarSdirs%om, (Western Hills Apartments at 230
Raphael AN Ln
BACKGROUND:
By Fire Code, Western Hills Apartments, at 230 Raphael Avenue needed an
adequate source of water for fire protection purposes. It was determined
that the apartment complex needed a fire hydrant. Looping the main
between South Dakota Avenue and Raphael Avenue was, required to get.
adequate flow to this hydrant.
Privately owned and maintained fire hydrants are not desired since it is
questionable whether the hydrant is operational at all times. For this
reason, the City prefers that the water main to this hydrant and fire
hydrant be under the City's control.
The water main and hydrants were installed in a water main easement
across Lots 5, 6, and 7 of Landmark Subdivision. VanHauen and Keller
Construction Co. Inc. installed the water main and fire hydrants according
to City of Ames standard construction specifications.
ALTERNATIVES:
1. Accept the water line and fire hydrants for City maintenance as
installed by VanHauen & Keller Construction Co. Inc. for Western
Hills Apartments.
2. Decline the water line and fire hydrant and let them remain under
private control.
MANAGER'S RECOMMENDED ACTION:
It is recommended by the City Manager that the City Council adopt alter-
native number 1, thereby accepting the water line and fire hydrants for
City maintenance as installed by VanHauen & Keller Construction Co. Inc.
for Western Hills Apartments.
COUNCIL ACTION•
JB:Orig
Mew
CITYliII"iiI OF AMES , IOWA 5001
Public Works Department
515 Clark
515-239-5160
March 6, 199.E
F6 z
Honorable Mayor and Council Members
City of Ames 14AR 3 01992
Ames, Iowa 50010 p,
CITY OF WES,IO1bA
Ladies and Gentlemen:
I hereby certify that the Watermain construction in the Western Hills Development
has been completed in an acceptable manner by Van Hauen & Keller of Ames and has
been inspected by the Engineering Division of the Public Works Department of, the
City of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
---------------------------------------------------------------------------------
1 8" Waterpipe L.F. 478
2 Tunnel for pipe L.F. 40
3 8" Tee EA. 1
4 Set hydrant & valve EA. 1
5 Tapping valve & sleeve EA. 1
PROJECT TOTAL $21,400.00
Sincerely,
Paul D. Wiegand,P.E.
Public Works Director
Approved by-,)
-;
T. Robert Kindred, Assistant City Manager .
PDW/kg
cc: City Clerk, Finance, Contractor, P.W. Admin. Asst. , P.W.Constr. Suprv.