Loading...
HomeMy WebLinkAbout~Master - Professional Services Agreement for WPC Bar Screen Replacement RESOLUTION NO. 14-646 RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT FOR DESIGN,BID, AND CONSTRUCTION PHASE ENGINEERING SERVICES FOR WATER POLLUTION CONTROL FACILITY BAR SCREEN REPLACEMENT FOR THE CITY OF AMES,IOWA WHEREAS, at the City's Water Pollution Control(WPC)Facility,constructed in 1989,the first step of the treatment process is screening the incoming flow to remove any large debris that could damage equipment or potentially plug pipes; and, WHEREAS, the current screening process splits the influent into three channels, each of which leads to a bar screen; and, WHEREAS, the two outside channels have identical equipment, but he middle channel houses a different style of screen that was installed in 2005 on a trial basis, and that has not performed to the satisfaction of City staff; and, WHEREAS,this project will replace the middle screen with a mechanical bar screen similar to the other two; and, WHEREAS, on September 9, 2014, staff issued a request for proposals for engineering services to design the replacement bar screen,and the request also included an evaluation of how the screenings are currently handled and recommendations for improved handling methods; and, WHEREAS, on October 17, 2014, staff received three proposals, and a thorough review of each firm's qualifications was performed by a seven person staff team with HDR Engineering being identified as the most qualified firm; and, WHEREAS, staff has negotiated the final scope of work with HDR Engineering to perform all necessary design,bid phase assistance, and construction phase engineering services required to complete the project as originally intended, and additional scope items not included in the original scope of work but which are required to complete the project were also added to HDR's scope of work; and, WHEREAS,the final negotiated fee is based on an hourlyrate not to exceed$70,135 without prior approval by the City; and, WHEREAS,the contract also includes $20,000 for special regulatory assistance to be used only at the request of the City in the event of unanticipated difficulties in obtaining an IDNR construction permit, which brings the total contract amount to $90,135. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the WPC Facility Bar Screen Replacement contract for design, bid, and construction-phase engineering services to HDR Engineering with compensation based on an hourly rate not to exceed $90,135, without prior approval, is hereby approved. ADOPTED THIS 16`h day of December, 2014. A. Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Betcher Seconded by: Goodman Voting aye: Betcher, Gartin, Goodman,Nelson, Orazem Voting nay: None Absent: Corrieri Resolution declared adopted and signed by the Mayor this 16'day of December, 2014.