Loading...
HomeMy WebLinkAbout~Master - Contract for Special Inspections for the New Water Treatment Plant RESOLUTION NO. 14-600 RESOLUTION APPROVING AGREEMENT FOR TECHNICAL SERVICES FOR SPECIAL INSPECTIONS ASSOCIATED WITH NEW WATER TREATMENT PLANT- CONTRACT 2 FOR THE CITY OF AMES,IOWA WHEREAS, construction of the new Water Plant will be performed under two separate construction contracts — Contract 1 includes the interconnecting piping between the old and new treatment plant locations,and Contract 2 includes construction of the actual treatment facilities;and, WHEREAS, Contract 1 will be bid later in 2014; and, WHEREAS,on October 14,2014,the Council awarded a construction contract for Contract 2 to Knutson Construction Services,Inc., of Minneapolis,Minnesota,in the amount of$52,497,000; and, WHEREAS, while the City was advertising for bids on the new Water Treatment Plant, a separate Request for Proposals (RFP) was issued to solicit firms to provide the necessary special inspections required by Chapter 17 of the 2009 International Building Code (IBC); and, WHEREAS, the selected firm will provide independent testing and inspection for the buildings that will house the new Water Treatment Plant and administrative offices; and, WHEREAS, examples of the types of materials inspected include: soils, mortar, grout, masonry,steel,aluminum,cast-in-place concrete,pre-cast concrete,welds,and fire resistive coating; and, WHEREAS,responses to the RFP were received from five firms,and after a thorough review of each firm's qualifications and proposed scope of services, it was determined that Terracon Consultants, Inc., of Ames, Iowa,was the most qualified firm; and, WHEREAS,this determination was made based on Terracon being qualified to perform the desired work and having submitted the most appropriate scope of work in response to the RFP;and, WHEREAS,the three lower priced firms were not selected because they failed to document all of the necessary qualifications to complete the inspections required, and because of staff's concern that their proposals did not reflect the quantity of inspections required for this project; and, WHEREAS, staff recommends that the contract be awarded to Terracon Consultants, Inc., on a time and materials basis, in an amount not to exceed$199,782. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that award of contract for Technical Services for Special Inspections to Terracon Consultants,Inc., of Ames, Iowa, on a time and materials basis, in an amount not to exceed $199,782 is hereby approved. ADOPTED THIS 25`h day of November, 2014. � �. A Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Nelson Seconded by: Goodman Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 25'day of November, 2014.