I hereby certify that the sanitary sewer and water main construction in
Ironwood Estates Subdivision has been completed in an -acceptable manner by
D.C. Construction Corporation of Ames, Iowa, in accordance with the speci-
fications and has been inspected by the Engineering Division of the Public
Works Department of the City of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
Item Description Quantity Unit Amount
Sanitary Sewer
1. Sanitary sewer manhole 4 each $ 4,540.00
2. 8" ABS 580 l.f. 5,133.00
3. Bedding rock 81.27 ton 1,361.27
$ 11,034.27
Water Main
1. 6" tapping valve & sleeve 1 each $ 1,083.00
2. 8" tapping valve & sleeve 1 each 1,250.00
3. 6" PVC - SDR 18 642 l.f. 3,723.60
4. Bends 8 each 1,232.00
5. 6" gate valve and box 1 each 435.00
6. Hydrant installation with tee 1 each 354.00
7. 12 gauge tracer wire 1,000 l.f. 150.00
$ 8,227.60
Grand total $ 19,261.87
Since ely,
rnold 0. Chantland, P.E.
Public Works Director
;even
e by:
L
Schainker, City Manager
AOC/dj
cc: amity G1er»k, D.C. Construction Corp. , Engineering Plus, Finance, Public
Works, Public Works Admin. Asst.