HomeMy WebLinkAbout~Master - Change Order No. 1 for 2012/13 Flood Response and Mitigation Project and 2009/10 Storm Water Facility Rehabilitation RESOLUTION NO. 14-536
RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH
CON-STRUCT, INC., OF AMES, IOWA,
FOR 2012/13 FLOOD RESPONSE AND MITIGATION PROJECT (NORTHRIDGE
PARKWAY SUBDIVISION) AND 2009/10 STORM WATER FACILITY
REHABILITATION PROGRAM(MOORE MEMORIAL PARK)
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. I on contract with Con-Struct, Inc., of Ames, Iowa, for the 2012/13 Flood
Response and Mitigation Project (Northridge Parkway Subdivision) and 2009/10 Storm Water
Facility Rehabilitation Program(Moore Memorial Park)be approved and adopted as attached hereto
and made a part hereof by this reference.
ADOPTED THIS 14th day of October, 2014.
tom• A++t,
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Gartin
Seconded by: Corrieri
Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 14th day of October, 2014.