HomeMy WebLinkAbout~Master - Contract and bond for City Hall Renovation - Phase 2 RESOLUTION NO. 14-501
RESOLUTION APPROVING CONTRACT AND BOND FOR
CONSTRUCTION OF
CITY HALL RENOVATION - PHASE 2
FOR THE CITY OF AMES, IOWA
WHEREAS,this City Council has heretofore determined it advisable and necessary that certain
improvements be constructed in the City of Ames,Iowa,such project having been designated as the City
Hall Renovation - Phase 2; and, pursuant to notice and hearing, bids were received on the 27th day of
August, 2014, as called for in the detailed plans and specifications as prepared by Walker Coen
Lorentzen Architects, Inc., and filed with the City Clerk on the 21st day of July, 2014; and,
WHEREAS,this Council has heretofore determined that the bid of HPC,LLC, of Ames,Iowa,
in the amount of$829,900.00 is the lowest and best bid submitted for the construction of said project;
and,
WHEREAS, contract in the form provided in said plans and specifications has been executed
by said contractor, and satisfactory performance bond has been filed by said contractor.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, as
follows:
Section 1. The contract between the City of Ames,Iowa,and HPC,LLC, of Ames,Iowa,in the
amount of$829,900.00 dated the 9th day of September, 2014, for the construction of the City
Hall Renovation -Phase 2 as provided for in the detailed plans and specifications referred to in
the preamble hereof, and the performance bond of the said contractor with Merchants Bonding
Company(Mutual)of Des Moines,Iowa,as surety thereon,in the amount of$829,900.00 filed
in connection therewith, be and the same are hereby approved.
Section 2. All resolutions or order or parts thereof in conflict herewith are hereby repealed to
the extend of such conflict.
ADOPTED THIS 23rd day of September, 2014.
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Goodman
Seconded by: Corrieri
Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 23'day of September, 2014.