HomeMy WebLinkAboutA008 - Letter dated December 13, 1977 certifying completion of sanitary sewer, storm sewer, and water main construction i December 13, 1977
Honorable Mayor & Council Members
City of Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the sanitary sewer, storm sewer, and water main construction
on Pinehurst Circle and Pinehurst Drive in the Green Fourth Addition and the Green
Fifth Addition to Ames, Iowa have been completed in an acceptable manner in accordance
with the plans and specifications of the City of Ames, Iowa, and inspected by the
Engineering Department of the City of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
SANITARY SEWER
Unit
Item Description Quantity Unit Price Amount
1 . 8" vitrified clay pipe 824 l .f. $ 9. 50 $ 7,828.00
2. Standard manhole 3 ea. 875.00 2,625.00
Total Sanitary Sewer $ 10,453.00
STORM SEWER
Unit
Item Description Quantity Unit Price Amount
1 . 12" reinforced concrete pipe 303 l .f. $ 9.50 $ 2,878.50
2. 12" flared end section 4 ea. 115.00 460.00
3. Type "D" intake 1 ea. 550.00 550.00
4. Type "A" intake 1 ea. 550.00 550.00
5. Concrete headwall 2 ea. 120.00 240.00
6. Concrete inset 1 ea. 190.00 190.00
7. Extra rip-rap 5.3 tons 8. 50 45.05
Total Storm Sewer $ 4,913.55
WATER
Unit
Item Description Quantity Unit Price Amount
1 . 6" ductile iron pipe 541 l .f. $ 8.25 $ 4,463.25
2. 8" ductile iron pipe 305 l .f. 11 .00 3,355.00
3. 8" - 450 bend & reaction block 1 ea. 135.00 135.00
4. 8" gate valve & box 1 ea. 350.00 350.00
v -2-
WATER (cont. )
Unit
Item Description Quantity Unit Price Amount
5. Wall type reaction block and
M.J. pipe plug 1 ea. $ 100.00 $ 100.00
6. 8"x6"x8" tee & reaction block 1 ea. 130.00 130.00
7. 8"x6" reducer 1 ea. 75.00 75.00
8. 6" gate valve & box 1 ea. 250.00 250.00
9. Set hydrants 3 ea. 175.00 525.00
Total Water $ 9,383.25
GRAND TOTAL $ 24,749.80
City's share for the difference in the cost of water main over six inches in
diameter:
Unit
Item Description Quantity Unit Price Amount
2. 8" ductile iron pipe 305 l .f. $ 1 .57 $ 478.85
3. 8" - 450 bend 1 ea. 16.79 16.79
4. 8" gate valve and box 1 ea. 71 .57 71 .57
6. 8"x6"x8" tee 1 ea. 22.66 22.66
7. 8"x6" reducer 1 ea. 75.00 75.00
Total City Share $ 664.87
Very truly you s,
A. . Cfiantland, P. E.
Public Works Director
APPROVED BY:
�;i j
fl
T. V. Sprenkel , City Manager
AOC:sh
cc: Buck Construction Co.
D. C. Construction Co.
Finance Department