Loading...
HomeMy WebLinkAbout~Master - Reallocation of funds for 2013/14 Downtown Pavement Improvements - 5th Street from Duff Avenue to Burnett Avenue RESOLUTION NO. 14-156 RESOLUTION APPROVING REALLOCATION OF SAVINGS FROM COMPLETED CIP PROJECTS TO HELP FUND THE 2013/14 DOWNTOWN PAVEMENT IMPROVEMENTS PROJECT (5TH STREET -DUFF AVENUE TO BURNETT AVENUE) FOR THE CITY OF AMES,IOWA WHEREAS, the annual Downtown Street Pavement Improvements program is for rehabilitation or reconstruction of streets within the downtown area, and the 2013/14 program location is 51h Street from Duff Avenue to Burnett Avenue; and, WHEREAS,this project includes removal and replacement of the existing pavement,storm sewer improvements, and sanitary sewer improvements, as well as ornamental street lighting and a ribbon of colored sidewalk concrete to match the previously reconstructed areas of downtown; and, WHEREAS, City staff and the engineering consultant, Snyder&Associates,held a project information meeting with area businesses and the Main Street Cultural District(MSCD);the project will be staged to maintain access to all businesses during construction and is scheduled for completion in the fall of 2014; and, WHEREAS,on March 19,2014,a bid on the project was received from Con-Struct,Inc.,of Ames, Iowa, in the amount of$1,234,443, with the engineer's estimate at $960,535; and, WHEREAS, engineering and construction administration costs are estimated at $185,150, bringing total estimated cost to $1,353,690; and, WHEREAS, the large cost increase is likely due to the specified staging related to coordination of the many activities in the area,which were included to provide excellent customer service; and, WHEREAS,there were several potential concrete contractors that were plan holders,and in follow-up conversations with these contractors,it was found that the staging required in the contract appeared to be complex, or else they would have needed to hire several subcontractors to complete the work; therefore, they made a choice not to bid on the work; and, WHEREAS, funding available for this project is summarized below: General Obligation Bonds (FY 2013/14 CIP for street) $1,000,000 Sanitary Sewer Funds (2013/14 Sanitary Sewer Rehabilitation Program)$ 125,000 Sanitary Sewer Funds (2011/12 Sanitary Sewer Rehabilitation Program) $ 90,000 Sidewalk Safety Program Funds (2013/14 CIP) $ 65,000 Unused G.O. Bond Funding (11/12 Collector Street Improvement Program) $ 150,000 Unused G.O. Bond Funding (09/10 Concrete Street Improvement Program) $ 150,000 Total Funding$1,380,000 NOW, THEREFORE,BE IT RESOLVED,by the City Council of the City of Ames, Iowa, that the reallocation of the specified savings from other completed CIP projects to help fund the 2013/14 Downtown Pavement Improvements Project(5`h Street-Duff Avenue to Burnett Avenue) is hereby approved. ADOPTED THIS 25`h day of March, 2014. cdao�jg-YAa& A. Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Goodman Seconded by: Orazem Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 25`h day of March, 2014.