Loading...
HomeMy WebLinkAboutA018 - Letter stating completion of utilities by Ames Trenching and Excavating, Inc. dated October 25, 1999 I C Public Works Department aring People 2:' Piogranu 515-239-5160 Exceptional Service October 25, 1999 OV _ 51%9 FN 9 i Honorable Mayor and Council Members CITY CLEITK City of Ames I CITY OF AMES,IOWA Ames, Iowa 50010 Ladies and Gentlemen: x I hereby certify that the utilities in Eastgate Subdivision have been completed in an acceptable manner by Ames Trenching and Excavating, Inc. and have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. As a result of this certification the financial security for public improvements on file with the City for this subdivision shall be set at$416,600.00 for the remaining work that includes 9"asphalt paving, curb and gutter,and bike path. I further certify that the quantities of the completed work are as follows: See Attachment. !Sincerely, U Paul D.Wiegand, P.E. Public Works Director PDW/kg Cc: City Clerk, Finance, Contractor, PW Admin.Assist., Construction Supervisor October 25, 1999 Page 2 Certifying Letter Description Unit Quantity Storm Sewer 15" RCP storm sewer If 1,172.0 18" RCP storm sewer If 310.0 24" RCP storm sewer If 556.0 30" RCP storm sewer If 132.0 36" RCP storm sewer If 678.0 48" RCP storm sewer If 1,721.0 24" RCP flared end ea 1.0 30" RCP flared end ea 1.0 Storm sewer manhole ea 9.0 Storm sewer intakes ea 27.0 Sanitary Sewer 8"sanitary sewer If 2,090.0 12"sanitary sewer If 1,530.0 Sanitary sewer manholes ea 12.0 Water Main 8"Water main If 3,660.0 8"water valves ea 11.0 Hydrant& hydrant run ea 8.0