HomeMy WebLinkAbout~Master - Rejection of all bids for Wheel Loader RESOLUTION NO. 13-547
RESOLUTION REJECTING ALL BIDS FOR WHEEL LOADER AND APPROVING
CONTINUED USE OF THE EXISTING WHEEL LOADER AT
THE POWER PLANT'S COAL YARD
FOR THE CITY OF AMES,IOWA
WHEREAS, a 2010 John Deere rubber-tired wheel load is operated in the Power Plant coal
yard, and on March 23,2010,the Council awarded a contract to Murphy Tractor and Equipment of
Altoona, Iowa, to purchase this Wheel Loader at a cost of $128,000 with a $89,000 buyback
guarantee; and,
WHEREAS, Murphy's buyback guarantee is for four years and 5,000 hours of use; and,
WHEREAS,the Wheel Loader was purchased based on the net low evaluated cost by using
the cost of the machine, less the guaranteed buyback; and,
WHEREAS,on December 1,2013,this Wheel Loader had approximately 4,765 hours on the
hour meter for three years of use, and to use this machine the full four years will accumulate hours
well beyond the 5,000-hour limit to receive the full $89,000 buyback guarantee; and,
WHEREAS,under the existing purchase agreement,Murphy will deduct from the buyback
$39.21 per hour over 5,000 hours; and,
WHEREAS, the average annual use over the past three years is 1,667 hours; and,
WHEREAS,typically,the option to exercise the buyback guarantee significantly benefits the
City, since the hours and replacement cycle of the Wheel Loader closely follow the plan,however,
during this cycle, the hours have accumulated faster than expected, making the buyback less
beneficial to the City; and,
WHEREAS,choosing to keep this wheel loader in service for an extended period and thereby
diminishing or foregoing the buyback can be a better financial decision if the existing wheel loader's
condition is acceptable to be used for the extended period; and,
WHEREAS, Fleet Services staff has evaluated the condition of this wheel loader and feels
confident the condition is satisfactory to continue use in the same capacity for three more years;and,
WHEREAS,with Council's approval,the City can choose to keep the current wheel loader
in service beyond the limits of the buyback,without penalty,while recognizing that the buyback will
be diminished or foregone; and,
WHEREAS, bids for a new wheel loader to replace the existing loader were received in
November 2013, and they were evaluated to determine the net low evaluated cost; and,
WHEREAS, a financial analysis demonstrates that rejecting the bids and retaining the
existing Wheel Loader will be the most cost-effective option over the next three years, and, in
making this determination,staff also considered the timing of the Power Plant's pending conversion
from coal to natural gas; and,
WHEREAS, that conversion should be accomplished in under three years, which can be
covered by the remaining life of the existing Wheel Loader.
NOW, THEREFORE,BE IT RESOLVED,by the City Council of the City of Ames, Iowa,
that all bids received for a new Wheel Loader are hereby rejected,and continued use of the existing
2010 John Deere 624K Wheel Loader at the Power Plant coal yard is hereby approved.
ADOPTED THIS 1 Oth day of December, 2013.
C�AA�"'R 14ad, Ate /
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Goodman
Seconded by: Davis
Voting aye: Davis, Goodman, Larson, Orazem, Szopinski, Wacha
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 1 Ot'day of December, 2013.