Loading...
HomeMy WebLinkAboutA008 - Letter dated December 21, 1992 certifying completion of sanitary sewer, water main, storm sewer, and street paving �• L l M AIVECC' C ITY O FA M E S , I OWA 5001,0 77 Public Works. Department 515 Clark 515-239-5160 December11992 _ Fu L Honorable Mayor and Council Members i' 6 4 f DEC 2 19�'� City of Ames Ames, Iowa 50010 c►; Ci1Y pF CLER►t APAES, IOWA Ladies and Gentlemen: I hereby certify that the sanitary sewer, water main, storm sewer, and street paving in Country,Gables4Subdivision, 5Addition have been completed in an acceptable manner by A.C.I. Mechanical Corp. , Construct Inc. , and Manatt's Inc. and have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further, certify that the quantities of the completed work are as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT -------------------'-------------------------------------------------------------- SEE ATTACHMENT PROJECT TOTAL $126,392.00 Sincerely, Paul D. Wiegand,P.E. Public Works Director Approved by: T. obert Kindred, Assistant City Manager PDW/kg AMES — THE CENTER OF IT ALL ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT ---------------------------------------------------------------------------------- SANITARY SEWER 8" Sewer pipe L.F. 657.0 Manholes Ea. 3.0 WATER MAIN 6" Water pipe L.F. 525.0 6" x 6" Tee Ea. 2.0 6" 45° Bend Ea. 2.0 6" Gate valve & box Ea. 3.0 Install hydrant run Ea. 2.0 STORM SEWER 24" Storm pipe L.F. 593.0 12" Storm Pipe L.F. 64.0 Open throat intakes Ea. 4.0 Manholes Ea. 2.0 UTILITY COSTS $95,190.00 PAVING Subgrade preparation S.Y. 2,019.0 Curb and gutter L.F. 1,063.0 Asphalt base, 6-j" Ton 581.18 PAVING COST $31,202.00 TOTAL COST $126,392.00