I hereby certify that the sanitary sewer, water main, storm sewer, and street
paving in Country,Gables4Subdivision, 5Addition have been completed in an
acceptable manner by A.C.I. Mechanical Corp. , Construct Inc. , and Manatt's Inc.
and have been inspected by the Engineering Division of the Public Works Department
of the City of Ames, Iowa.
I further, certify that the quantities of the completed work are as follows:
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
-------------------'--------------------------------------------------------------
SEE ATTACHMENT
PROJECT TOTAL $126,392.00
Sincerely,
Paul D. Wiegand,P.E.
Public Works Director
Approved by:
T. obert Kindred, Assistant City Manager
PDW/kg
AMES — THE CENTER OF IT ALL
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
----------------------------------------------------------------------------------
SANITARY SEWER
8" Sewer pipe L.F. 657.0
Manholes Ea. 3.0
WATER MAIN
6" Water pipe L.F. 525.0
6" x 6" Tee Ea. 2.0
6" 45° Bend Ea. 2.0
6" Gate valve & box Ea. 3.0
Install hydrant run Ea. 2.0
STORM SEWER
24" Storm pipe L.F. 593.0
12" Storm Pipe L.F. 64.0
Open throat intakes Ea. 4.0
Manholes Ea. 2.0
UTILITY COSTS $95,190.00
PAVING
Subgrade preparation S.Y. 2,019.0
Curb and gutter L.F. 1,063.0
Asphalt base, 6-j" Ton 581.18
PAVING COST $31,202.00