Loading...
HomeMy WebLinkAboutA008 - Letter dated September 22, 1976 certifying completion of sanitary sewer, storm sewer, and water main construction F �9- September 22, 1976 Honorable Mayor and Council Members City of Ames , Iowa Ladies and Gentlemen: I hereby certify that the sanitary sewer, storm sewer and water main construction on Crystal Street and Diamond Avenue in Country Gables Second Addition to Ames, Iowa have been completed in an acceptable manner in accord- ance with the plans and specifications of the City of Ames, Iowa and inspec- ted by the Engineering_Department. of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: Sanitary Sewer Unit Item Description Quantity Unit Price Amount 1 . 8" vitrified clay pipe 1308 lin.ft. @$ 8.25 $10,791 .00 2. 48" standard manhole 5 each 725.00 3,625.00. 3. 8" pipe plug 1 each 15.00 15.00 Total $14,431 .00 Water Main 1 . 6" ductile iron pipe 1131 lin.ft. @$ 10.50 $11 ,875.50 2. Place hydrants (includes 2 - 6" x 6" x 6" tees) 3 each 600.00 1 ,800.00 3. 6" valve. and box 2 each 315.00 630.00 4. Wall pipe reaction block 2 each 199.50 399.-00 Total $14,704.50 Storm Sewer 1 . 12" reinforced concrete pipe 201 lin.ft. @$ 10.20 $ 2,050.20 2. 18" reinforced concrete pipe 563 lin.ft. 12.75 7,178.25 3. 21 " reinforced concrete pipe 623 lin.ft. 13.00 8,099.00 4. Standard manhole 2 each 700.00 1 ,400.00 -2- Storm Sewer (continued) Unit Item Description Quantity Unit Price Amount 5. Type "D" Intake 3 each @$560.00 $ 1 ,680.00 6. Type "E" Intake 4 each 630.00 2,520.00 7. 21" reinforced concrete flared end section 1 each 200.00 200.00 8. 4' x 3' x 6" concrete curtain wall 1 each 150.00 150.00 9. 12" pipe plug 1 each 20.00 20.00 10. Type "D" Rip-rap 30 ton 15.00 450.00 Total $23,747.45 GRAND TOTAL $52,882.95 Ve y my ours A. 0. Chantland, P. E. Public Works Director APPROVED BY: l Terry V. Spr nkel',/Ci ty Manager AOC:jm cc: Schill Builders, Inc. Iowa Road Builders . Finance Department Public Works Department