January 6, 1994 IM
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the following watermain, storm sewer, curb & gutter, and street
base paving in Cooper's Second Subdivision has been completed in an acceptable manner
by Kent Cooper, Con-Struct Inc. , and Manatt's Inc. and has been inspected by the
Engineering Division of the Public Works Department of the City of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
SEE ATTACHMENT
Project Total $52,200.00
Sincerely,
Paul D.Wiegand,P.E.
Public Works Director
Approved by:
T. Robert Kindred; Assistant City Manager
PDW/kg
c: City Clerk, Finance, Contractor, PW Admin.Asst. , Construction Supervisor
Item Description Unit Price Ouantity Total
WATERMAIN
1 8" P.V.C. water pipe l.f. 396.0
2 8" M.J. pipe plug ea. 1.0
3 Wall pipe reaction block ea. 1.0
4 8" gate valve and box ea. 1.0
5 8" x 6" M.J. anchoring tee ea. 1.0
6 Install hydrant run ea. 1.0
7 8" tapping valve and sleeve ea. 1.0
WATERMAIN SUBTOTAL: $13,000.00
STORM SEWER
1 12" R.C.P. l.f. 123.0
2 12" R.C.P. F.E.S. ea. 1.0
3 Open throat intake ea. 3.0
4 Shot rock rip rap ton 3.0
5 Install 36" R.C.P. l.f. 56.0
6 Remove 48" C.M.P. l.s. 1.0
STORM SEWER SUBTOTAL: $11,000.00
STREET PAVING
1 Concrete curb and gutter l.f. 1070.0
2 Asphalt base, 5.5" S.Y. 1440.0
STREET PAVING SUBTOTAL: $28,200.00
PROJECT TOTAL $52,200.00