Loading...
HomeMy WebLinkAboutA024 - Letter to Mayor and Council dated November 20, 1992, certifying completion of water main, storm sewer, curb and gutter and street base paving nf � ��Ii"'�i CITY OF AMES , I OWA 50010 Public Works Department 515 Clark 515-239-5160 November 20, 1992 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the following water main, storm sewer, curb and gutter, and street base paving in Cooper's Second Subdivision have been completed in an acceptable manner by Kent Cooper, ConStruct Inc. , and Manatt's Inc. and have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa. I further certify that the quantities of the completed work are as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT --------------------------------------------------------------------------------- SEE ATTACHMENT PROJECT TOTAL $52,200.00 Sincerely, Paul D. Wiegand,P.E. Public Works Director Approve jtq{je T. Robert Kindred, Assistant City Manager PDW/kg cc: City Clerk, Finance, Contractor, PW Adm. Asst. , PW Const. Supr. AMES — THE CENTER OF IT ALL ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT ---------------------------------------------------------------------------------- WATER MAIN 1 8" P.V.C. water pipe L.F. 396.0 2 8" M.J. pipe plug Ea. 1.0 3 Wall pipe reaction block Ea. 1.0 4 8" gate valve and box Ea. 1.0 5 8" x 6" M.J. anchoring tee Ea. 1.0 6 Install hydrant run Ea. 1.0 7 8" tapping valve & sleeve Ea. 1.0 WATER MAIN SUB-TOTAL $13,000.00 STORM SEWER 1 12" R.C.P. L.F. 123.0 2 12" R.C.P. F.E.S. Ea. 1.0 3 Open throat intake Ea. 3.0 4 Shot rock rip rap Tons 3.0 5 Install 36" R.C.P. L.F. 56.0 6 Remove 48" C.M.P. L.S. 1.0 STORM SEWER SUB-TOTAL $11,000.00 STREET PAVING 1 Concrete curb and gutter L.F. 1070 2 Asphalt base, 5.5 inches S.Y. 1440 STREET PAVING SUB-TOTAL $28,200.00 GRAND TOTAL $52,200.00