CITY OF AMES , I OWA 50010
Public Works Department
515 Clark
515-239-5160
November 20, 1992
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the following water main, storm sewer, curb and gutter, and
street base paving in Cooper's Second Subdivision have been completed in an
acceptable manner by Kent Cooper, ConStruct Inc. , and Manatt's Inc. and have been
inspected by the Engineering Division of the Public Works Department of the City
of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
---------------------------------------------------------------------------------
SEE ATTACHMENT
PROJECT TOTAL $52,200.00
Sincerely,
Paul D. Wiegand,P.E.
Public Works Director
Approve jtq{je
T. Robert Kindred, Assistant City Manager
PDW/kg
cc: City Clerk, Finance, Contractor, PW Adm. Asst. , PW Const. Supr.
AMES — THE CENTER OF IT ALL
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
----------------------------------------------------------------------------------
WATER MAIN
1 8" P.V.C. water pipe L.F. 396.0
2 8" M.J. pipe plug Ea. 1.0
3 Wall pipe reaction block Ea. 1.0
4 8" gate valve and box Ea. 1.0
5 8" x 6" M.J. anchoring tee Ea. 1.0
6 Install hydrant run Ea. 1.0
7 8" tapping valve & sleeve Ea. 1.0
WATER MAIN SUB-TOTAL $13,000.00
STORM SEWER
1 12" R.C.P. L.F. 123.0
2 12" R.C.P. F.E.S. Ea. 1.0
3 Open throat intake Ea. 3.0
4 Shot rock rip rap Tons 3.0
5 Install 36" R.C.P. L.F. 56.0
6 Remove 48" C.M.P. L.S. 1.0
STORM SEWER SUB-TOTAL $11,000.00
STREET PAVING
1 Concrete curb and gutter L.F. 1070
2 Asphalt base, 5.5 inches S.Y. 1440
STREET PAVING SUB-TOTAL $28,200.00
GRAND TOTAL $52,200.00