September 28, 1991
Honorable Mayor and Council Members
City of Ames OCT - 1991 j
Ames, Iowa 50010 a
CITY CLERK
CITY OF 1MES, IOt"dA
Ladies and Gentlemen: -
I hereby certify.that the Bloomington Heights, Plat I utility and paving work on
Eisenhower Avenue and Taylor Circle has been completed in an acceptable manner by
McAninch Corp., VanHauen & Keller Contractors, and Manatt's Inc. and has been
inspected by the Engineering Division of the Public Works Department of the City
of Ames, Iowa.
I further certify that the quantities of the completed work are as follows:
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
---------------------------------------------------------------------------------
SEE ATTACHMENT
Sincerely,
Paul D. Wiegan ,P.E.
Public Works Director
Approve by:
I44� —
T. Robert Kindred, Assistant City Manager
PDW/kg
cc: City Clerk, Finance, Contractor, P.W. Admin. Asst. , P.W.Constr.Suprv.
AMES — THE CENTER OF IT ALL
-a
Bloomington Heights, Plat I Utility and Paving Work
ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT
----------------------------------------------------------------------------------
Sanitary Sewer
1 8" sanitary sewer l.f. 460.0
2 Standard 48" dia. manhole ea. 3.0
19,452.00
Water Main
3 8" water main l.f. 472.0
4 8" on 12" M.J. tapping valve & sleeve ea. 1.0
5 8" x 6" M.J. tee ea. 2.0
6 Install hydrant furnished by city ea. 2.0
7 8" M.J. gate valve and box ea. 2.0
8 8" M.J. pipe plug ea. 2.0
9 6" M.J. gate valve and box ea. 3.0
10 8" M.J. cross ea. 1.0
11 6" water main l.f. 160.0
12 8" x 6" reducer ea. 1.0
12,522.00
Storm Sewer
13 15" R.C.P. l.f. -282.0
14 15" R.C.P. F.E.S. ea. 1.0
15 12" R.C.P. l.f. 58.0
16 Open throat intake ea. 4.0
12,444.00
Streets
17 Curb and Gutter l.f. 1261.0
18 Asphalt base, standard ton 527.0
19 Asphalt base, bus route ton 122.0
34,565.00
------------
Total cost $78,983.00