HomeMy WebLinkAboutA008 - Letter to Mayor and Council dated January 26, 2000 - utilities and base paving complete Public Works Department
Caring Nopk 515 Clark Avenue, Ames, Iowa 50010
Qw hl pwgr Phone 515-239-5160 A Fax 515-239-5261
Fs ep000al Service
January 26, 2000
Honorable Mav_ or and Council Members
Citv of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the utilities and base paving required as a condition for approval
of the final plat of Bentwood Subdivision 4`' Addition have been completed in an
acceptable manner by KRI Co., and Manatt's Inc. The above mentioned
improvements have been inspected by the Engineering Division of the Public Works
Department of the City_ of Aires, Iowa and found to meet city_ specifications and
standards.
As a result of this certification it is recommended that the financial security for public
improvements on file with the City for this subdivision be reduced to $ 29,000 for
the remaining work that includes ACC surface, street lights, and miscellaneous items.
Sidewalks also remain to be completed, but are covered under a separate agreement
that does not require financial security.
I further certify that the quantities of the completed work are as follows:
See attached sheet.
Sincerely,
Paul D. Wiegand, P.E.
Public Works Director
PDW/dwj
Attachment
cc: City Cleric, Finance, Contractor, PW Administrative Assistant, Construction
Supervisor, and Brian O'Connell, Planning & Housing Director
Bentwood Subdivision 4th Addition
January 26, 2000
Page 2
:: Qit € i.:
Storm sewer
15" storm sewer l.f. 636
18" storm sewer l.f. 230
24" storm sewer l.f. 172
Storm sewer manhole ea. 2
Storm sewer inlet stricture ea. 6
6" collector line 1.f. 577
Collector line clean out ea. 3
Sanitary sewer
8" sanitary sewer l.f. 1,341
Sanitary manhole ea. 7
Water Main
12" water main l.f. 1,428
Main line valve ea. 7
Hydrant and hydrant valve ea. 7
31' wide 6" asphalt base, «,/30" PCC curb &- utter l.f. 1,430